Translated by

ASE Group

Company

width=200px

Owners:
Rosatom
3000 employees in 2015
200px

Assets

Assets

+ ASE Group (AO ASYA)

The Atomstroyexport joint-stock company (AO ASYA) is the external economic engineering company of ROSATOM State Corporation on construction of facilities of nuclear power engineering abroad.

The ASE group is created within formation of an engineering division of ROSATOM State Corporation by a join path of four leading companies of the industry: JSC NIAEP, JSC to ASYA, JSC Atomenergoproekt, JSC Atomproyekt. The ASE group is one of participants of world atomic engineering business, occupying more than 30% of global market of a construction of the NPP. Representations and operational offices of ASE Group operate on the territory of 15 countries of the world, nearly 80% of an order portfolio of the company are the share of projects abroad.

Besides, ASE implements projects on construction of facilities for the address with Russian joint stock company and SNF, heat supply facilities and also renders a full range of services of EPC, EPC (M) and PMC of services for any difficult engineering objects. The ASE group is a developer and actively implements the innovation project management system on a construction of difficult engineering objects – Multi-D allowing to manage more effectively such parameters as: budget, terms, quality. The Doctor of Economics Limarenko Valery Igorevich directs ASE Group.

2017: Competence center on automation of engineering activity

On June 19, 2017 ASE and SAP SNG Group signed the memorandum of cooperation in management of lifecycle of objects of nuclear power.

According to the document, the ASE Group in partnership with SAP will create Competence center on automation of engineering activity. Implementation in process of capital construction of the NPP and other objects of nuclear power of such technologies as management of lifecycle of an asset, machine learning, analytics of Big Data will become a main goal of future Center.

All called technologies are integrated by the concept of the digital NPP in which center — a common information space for management of lifecycle of nuclear power plant from the idea of a construction before decommissioning. All data on the course of design, construction, and after operation are stored in a binding to a 3D model, updated in real time on the basis of information from business applications and other systems.

To apply the idea of the digital NPP to future projects, in Competence center it is going to develop own IT solution based on SAP HANA — "Command Center Construction of the NPP in the Russian Federation and Abroad". Besides, technologies of SAP will help ASE Group to manage logistics of the NPPs under construction: buy, transport and store construction materials and the equipment, minimizing costs; to precisely predict terms and cost of construction.