Boiler house Arbekovo

Company

Content

Owners

+ T Plus (earlier IES-Holding. Integrated Energy Systems)

The set thermal power - 400 Gcal/hour on hot water + 50 t/hour on pair or it is 32 Gcal/hour = 432 Gcal/hour.

Number of staff for November, 2019 – the 67th persons.

Extent of thermal networks in Penza in one-pipe calculation for November, 2019 – 295,318 m.

History

1995: Input of additional boilers

From 1986 to 1995 2 VK PTVM-50, 2 boilers of the boiler KVGM-100, 2 DE 14-25-250GM boilers were in addition put into operation, chemical water cleaning and black oil economy are constructed.

1976: Commissioning

In December, 1976 in the residential district Arbekovo the I queue of the district water-heating boiler house with the name of the same name was put into operation. At that time it was equipped with three boilers PTVM-50. Afterwards, in connection with rapid expansion of the residential district, the decision and on re-equipment of the enterprise was made.