History

2019: Upgrade of gas distribution station for 1.2 billion rubles

On March 15, 2019 the Gazprom Neft company reported that Moscow Refinery completed the works on upgrade of gas distribution station. The complex allows to make and ship automobile and by rail the liquefied petroleum gases demanded by the market — propane and butane and also to produce mix of gases. The project is implemented within the program of large-scale upgrade of Moscow Refinery which since 2011 is carried out by Gazprom Neft. Investment volume is 1.2 billion rubles.

Moscow Refinery

Within the project the reservoir park of liquefied petroleum gases is also upgraded, the quantity and total amount of tanks up to 3200 CBM are increased. Power of the updated gas distribution station on acceptance and shipment is 256 thousand tons per year.

The gas distribution station provides modern technology which guarantees complete tightness of process of shipment and excludes hit of gases in the atmosphere thanks to the system of catching and vapor return. The installed equipment and the high level of automation increased shipment speed twice. Level of industrial security of an object is in addition increased. Each block is equipped with own emergency protection system, and all station is equipped with modern automated systems of security and fire extinguishing.

«
Upgrade of gas distribution station gives the chance quickly and eco-friendly to perform shipment of products. Thanks to the installed equipment the enterprise will be able to supply different grades of gases to the market: propane, butane, isobutane, propane - butane mix. It is important to note that all parameters of gas distribution station are calculated taking into account perspective of development of the plant. Future projects of upgrade of Moscow Refinery will allow to increase shipment of the gases used for utility needs. We are ready to it.
Maxim Artemenko, technical director of Moscow Refinery
»

2018

Reduction of consumption of heat, fuel and electric power

On March 18, 2019 Gazprom Neft reported that at the end of 2018 own oil refineries — Omsk and Moscow — significantly reduced consumption of heat, fuel and the electric power. Economic effect of accomplishment of energy saving actions was 447.4 million rubles, having exceeded a planned target for 49.7%. Decrease in energy consumption at oil refinery continues thanks to program implementation of increase in energy efficiency of oil processing assets of Gazprom Neft.

Gazprom Neft Oil Refinery

Within the program on Omsk Refinery works on processing of a number of installations as the innovation heatsaving covering, optimization of the modes of technology furnaces and reconstruction of trunk steam lines are performed. On Moscow Refinery the park of the thermal and parokondensatny equipment is upgraded, the efficiency of the pumping equipment is increased. In total in 2018 at the Omsk and Moscow oil refineries of Gazprom Neft 25 energy saving projects were implemented.

«
Since 2008 the company implements the program of upgrade of oil processing assets, one of the purposes of which is the consecutive growth of energy efficiency. Within this program at oil refinery build modern installations, implement automated control systems and control, get rid of technology objects of last generation. Decrease in energy consumption together with growth of efficiency of the oil processing enterprises allows to provide additional reduction impact of production on the environment.
Anatoly Cherner, deputy CEO for logistics, processing and sale of PJSC Gazprom Neft
»

The total volume of production of bituminous materials increased on a quarter

On February 15, 2019 Gazprom Neft reported that Moscow Refinery completed the planned works on installation of production of bitumen. Specialists of the enterprise in addition increased reliability and efficiency of installation within preparation for the summer period of road-building works. Bituminous installation of Moscow Refinery is one of the most hi-tech and the largest in Europe on outputs.

Installation of production of bitumen of Moscow Refinery

In a work progress more than 1.2 thousand meters of pipelines, reservoirs and columns are prepared, reliability of technology process and efficiency of installation is in addition increased. All production processes are completely automated. Installation is equipped with the system of hermetic filling which allows to make shipment according to the most strict ecological requirements. Technologies of Moscow Refinery provide a possibility of simultaneous production and shipment of several grades of bitumens, including the improved quality.

«
Exact implementation of all actions for upgrade of production of Moscow Refinery provided growth of efficiency of all production chains which part is also installation of production of bitumen. In 2018 it gave record levels: the total volume of production of bituminous materials increased on a quarter, in comparison with results of 2017. Thanks to eco-friendly technologies, further, the enterprise will increase development of quality fuel and oil products.
Oleg Lazarev, deputy CEO of Moscow Refinery for production
»

Reduction of consumption of a river water more than for 70%

On February 8, 2019 Moscow Refinery of Gazprom Neft reported that it achieved good result in saving of water resources for the first year of work of biological treatment facilities Biosphere. The complex reached design capacity and provides almost closed loop of water consumption. Thanks to Biosphere in 2018 Moscow Refinery more than reduced consumption of a river water by 70% and also significantly reduced load of city treatment facilities.

"Biosphere" of Moscow Refinery

"Biosphere" is developed by the Russian company and provides complex technology of sewage treatment, special for domestic oil processing, to 99.9%. Modern methods guarantee complete removal of all pollutants. All reservoirs of the Biosphere complex are absolutely hermetic, off gases undergo special cleaning using effective plasma and catalytic technology. Before an exit air is in addition purified on filters and disinfected by ultra-violet light. For February, 2019 the Biosphere complex conditions about 17 thousand m3 waters in day and, having double power reserve, is ready to input of additional objects according to the program of upgrade of MNPZ.

«
The projects similar to Biosphere allow Moscow Refinery to save the leading positions in a question of upgrade of the industrial sector of the capital. The complex became a reliable part of city infrastructure and allowed to lower many times load of capital treatment facilities.
Vitaly Zuber, CEO of Moscow Refinery
»

Vitaly Zuber is appointed the CEO

In February, 2018 the Moscow Oil Refinery announced appointment of Vitaly Zuber as the CEO who released from this duty the Arcadia of Egizaryan heading the enterprise since 2010. Read more here.

Arkady Egizaryan passed into the corporate center of Gazprom Neft where directs implementation of key projects of digital transformation of the block of logistics, processing and sale.

2017

Down the river from Volgodonsk the column of vacuum distillation is delivered

On June 17, 2017 the cargo barge down the river delivers the Russian large-size equipment for building of the combined Euro + installation of Moscow Refinery. The column of vacuum distillation made in Volgodonsk by AEM-tekhnologii company (enters into Atomenergomash — a machine-building division of Rosatom State Corporation), will become a part of the block of primary oil refining. In a vacuum column there is separation of the fuel oil which remained after atmospheric distillation. The vacuum in the device allows to warm fuel oil up to the necessary temperature and to provide its clear split into components — raw materials for further fuel production and bitumen. The new device will provide production of components of fuel of high ecological class Euro-5 and modern bitumen.

The column, unique on weight and dimensional characteristics, is delivered across Volga-Don Canal. In total in the river way the equipment weighing more than 500 tons passed 2500 kilometers. For transportation optimization the column is delivered by in the unassembled form, enlarged assemblies in number of seven modules. The delivered modules placed on the special mooring in Conversations situated near Moscow from where on the building site "Euros +" will transport them cargo tractors.

The Euro + installation is intended for primary oil refining and production of components of fuels of high ecological class Euro-5. Construction of a new complex will allow MNPZ to take several installations of the previous generation out of service and to increase a between-repairs run from two to four years that will provide additional stability of the fuel market of the capital region.

Start of the Center of monitoring and diagnostics of automation systems of production management

In June, 2017 on Moscow Refinery of Gazprom Neft there began work the Center of monitoring and diagnostics of automation systems of production management (TsMiD). Using a modern hardware and software system the new center round the clock controls a status and work of all elements of management systems for the plant. Collected information allows to predict and reveal factors which are potentially capable to result in fault of the equipment at an early stage and to prevent deviations.

Creation of the center became the next stage of the comprehensive program of automation of processing and sale of Gazprom Neft. The company opened the first center of monitoring and diagnostics on Omsk Refinery in 2015. The project of Gazprom Neft has no analogs in Russia and represents the unique complete solution on the round-the-clock and continuous control and diagnostics of a status of technology equipment of oil processing company assets.

Monitoring acts on all levels of automation of Moscow Refinery: are connected to the Center as field instrumentations and software packages of management systems, and virtual analyzers of advanced process management systems of oil processing. Continuous remote observation allows to reveal the non-optimal modes of operation of the equipment and to adjust them. Besides, the round-the-clock and continuous monitoring gives an opportunity to create the diagram of service of technology objects proceeding from their actual state and also promotes reduction of quantity and duration of regular maintenance inspections.

At the first stage of implementation the perimeter of the Center already includes management systems of key installations of secondary processing of MNPZ. Data of Moscow Refinery are in real time available to specialists of Command center efficiency of processing and the sale of Gazprom Neft located in St. Petersburg. At this time TsMiD MNPZ controls work of 25 PCS systems and more than 1.2 thousand instrumentations. By the end of 2018 all technology objects of Moscow Oil Refinery should be connected to the Center.

"The new center is a part of the global project of Gazprom Neft on creation of a single technology platform of performance management of processing and sale. We consistently implement the comprehensive program of automation of oil processing directed to implementation and development of the high-tech solutions allowing to increase efficiency and operational reliability of Gazprom Neft Oil Refinery and also level of production security of the overworking assets", - the deputy CEO of Gazprom Neft for logistics, processing and sale Anatoly Cherner noted.

Testing of automatic system of security

In May, 2017 on Moscow Refinery balancing and commissioning after completion of planned actions for upgrade of installations of catalytic cracking and primary oil refining and also to standard repair of installations of "a big technology ring" is continued. On May 14 at 9:30 a.m. installation of receiving sulfur of Moscow Refinery was stopped during testing of automatic system of security. A system worked regularly, non-staff situations were not. Installation will be started according to production schedules.

The configuration of process systems of the plant used at the moment provides accomplishment of the approved production program on release of products.

Objective data of an end-to-end system of environmental monitoring of MNPZ confirm lack of exceeding on emissions of pollutants on objects of the plant.

On the platform of Moscow Refinery there are works within the program of upgrade of the enterprise. As a result of the performed works the power of the installation of catalytic cracking (G-43-107) intended for production of components of high-octane gasolines of environmental standard Euro-5 will increase by 20 percent. The efficiency of a key object of the plant — installation of primary oil refining (ELOU-AVT-6) providing preparation of raw materials for further production of commodity oil products will increase by 16 percentage points. The energy efficiency of Moscow Oil Refinery will in addition increase and impact on the environment will be reduced.

Installation of a column of reforming for oil refining installation "Euro +"

On Moscow Refinery installation of a crucial element of the block of catalytic reforming of the combined oil refining installation "Euro +" came to the end. The set reforming column — the process of secondary oil refining providing production of components for high-octane gasolines — weighs 150 tons, its height is 60 meters.

The new column consists of four reactionary devices located one above another where from installations of primary oil refining the petrol fraction for interaction with the catalyst will arrive. Thanks to modern technology of continuous regeneration process of recovery of activity of the catalyst will happen without stopping the equipment. It will allow to increase efficiency of production in addition. Power of the block of catalytic reforming on raw materials will be 1 million tons per year.

The technology of continuous catalyst regeneration provides its circulation between a column of reforming and the block of regeneration for recovery of properties without stopping of production. The catalyst — porous granules with a diameter of 1-2 mm — is loaded into an upper part colons and passes through it, constantly interacting with raw materials. From the lower part colons the fulfilled catalyst goes to the regeneration block where recovers the properties and again comes to an upper part reforming colons.

Building of the Euro + installation began in 2016, for May, 2017 20% of works are performed. Are submerged in soil of 11.6 thousand piles. 24 thousand cubic meters of concrete — 75% of total amount are filled in. 9 thousand tons of metalwork are delivered to the plant. 22 of 31 units of the large-size equipment are set. The general contractor on construction "Euro +" is NIPIGAZ conducting the Russian center for design management, deliveries and construction.

Building of the modern combined oil refining installation "Euro +" — one of the main projects of the second stage of complex upgrade of MNPZ which since 2011 is conducted by Gazprom Neft company. Commissioning "Euro +" will allow Moscow Refinery to raise the output of light oil products, to pass to the increased four-year between-repairs run, to improve indicators of energy efficiency and in addition to reduce impact of production by the environment.

See Also