Trans-Ural combined heat and power plant

Company

Owners

+ Inter RAO UES, JSC

The trans-Ural combined heat and power plant is included into "The Bashkir generation company". The enterprise releases electrical and thermal energy on heating, is the main source of the electric power for the Bashkir Trans-Ural region and heat for the city of Sibay. The set electric power for November, 2019 – 17.444 MW, thermal – 28.44 Gcal/h. Fuel – natural gas.

History

2011

In 2009-2011 the combined heat and power plant was expanded due to construction of boiler workshop and the 16 MW gas turbine unit with the water-heating boiler utilizer (GTES-16 of PAS).