Project

"Automatic equipment" completed reconstruction of the boiler house in Kaluga

Customers: Kaluga electromechanical plant (KEMZ)

Product: Complex projects of creation of the engineering systems

Project date: 2016/11  - 2019/11
Project's budget: 286 000 000 руб.

2019: Completion of works on reconstruction of the boiler house

On December 13, 2019 the Automatic equipment Concern reported that on Kaluzhskom elektromekhanicheskom zavode (JSC KEMZ) the works on reconstruction of the boiler house were completed: modern boilers were installed, replacement of the pumping equipment and the system of chemical water treatment is made. Thanks to upgrade of production JSC KEMZ completely refused steam, and the technology of work of galvanic section is transferred to superheated water.

The boiler house of JSC KEMZ was put into operation in 1986. Works on its reconstruction with replacement of the obsolete equipment lasted about three years. During hardware upgrade works on warming of a facade of the body, replacement of a roof and repair of internal premises were in addition carried out.

Total power of the boiler house before reconstruction was 117 Gcal/hour (unit characterizing amount of heat, made or used by this or that equipment for unit of time) and included 3 boilers and 3 steam. Total power of the upgraded boiler house is 55 MW/hour (unit of measure of electric power). This power more than is enough both for own needs of the enterprise, and for heating and hot water supply of the residential sector. For December, 2019 the plant supplies with heat 93 houses, 14 social objects and also 89 objects of a private property.

For December, 2019 the investments of JSC KEMZ enclosed in reconstruction made more than 286 million rubles.

The right to solemnly cut a red ribbon was granted to the head of Kaluga Dmitry Razumovsky and the CEO of JSC KEMZ Boris Movtyan.

File:Aquote1.png
Projects on hardware upgrade and reconstruction of production are the important instrument of increase in operational efficiency of the enterprises. They allow to use optimum production resources, to provide uninterrupted operation of functioning and to create safe working conditions for employees. Reconstruction of the boiler house of JSC KEMZ considerably will increase technology safety and energy efficiency of production. Besides, the Avtomatika Concern of State Corporation Rostec solved a social problem, having provided high-quality service of housing and public utilities for residents of Kaluga, having supplied them with heat and hot water,
comments the CEO of Avtomatika Concern Vladimir Kabanov
File:Aquote2.png