RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

IBS prepared infrastructure for work of RUSNANO

Customers: Rusnano

Moscow; Information Technology

Contractors: IBS
Product: Complex projects of creation of the engineering systems

Project date: 2011/04

In RUSNANO building located in Moscow on 60-letiya October Avenue, the IBS company implemented the project on creation of engineering network infrastructure. Based on the high-speed local computer network (LCN) services of the IP telephony, wire and wireless line access to local to both Internet resources and information systems are implemented.

The project provided creation of a LAN "from scratch", including deployment of a structured cabling system and wireless network segment, delivery and setup of all necessary telecommunication equipment and also creation of an electric power supply system for jobs of users. New infrastructure is capable to ensure functioning more than 500 employees.

Within the project the company performed migration of IT infrastructure from old in new office and also supplied the engineering and telecommunication equipment considerably expanding the existing IT infrastructure to RUSNANO. In the project the equipment and solutions of Cisco company were used

Creation of engineering infrastructure for a data processing center of RUSNANO became one of the directions of works also. As a result of DPC it was provided with a power supply system, including the system of the guaranteed power supply on the basis of the diesel generator sets (DGS), conditioning systems, control and monitoring of process parameters of DPC, video surveillance, automatic gas fire fighting, scheduling and management of DPC.

"In a project deliverable RUSNANO received the most modern IT infrastructure, and our employees can use different information and communication services in the work that increases both convenience, and work performance", - the CIO of RUSNANO Kelmanzon Andrey Klimentyevich comments.

The project was executed in 8 months.