[an error occurred while processing the directive]
RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

NETA created IT infrastructure for Mirninsky district

Customers: Municipality Administration Mirninsky area

Government and social institutions

Contractors: NETA
Product: SCS projects and wireless network infrastructure

Project date: 2011/04

Within the project the NETA company built a structured cabling system, a local computer network, an information security system, the PBX, implemented the system of the selected and regular power supply, conditioning.

For creation of effective information infrastructure of the enterprise the status of the structured cabling system (SCS) is of particular importance. The network of Municipality Administration existing earlier Mirninsky area represented several not connected fragments and did not provide the necessary level of communications between divisions and the staff of the organization any more.

In the four-storeyed building of administration it was required to construct modern SCS, meeting the requirements of fault tolerance, controllability, scalability and also to create an environment for its effective and smooth functioning.

As a technology basis of SCS the NETA company proposed the solution based on the equipment of AMP and Legrand. The structured cable network is built according to requirements of the international standard ISO/IEC 11801. The possibility of expansion, modification, upgrade of SCS, transition to other standards of data transmission without change of the main structure is provided.

Within the project the local computer network (LCN) which integrated 128 jobs is created. On a LAN the protected segment for providing necessary conditions of processing of confidential information and personal data is created. Data exchange in corporate network, net surfing the Internet are organized using active network equipment of Cisco. Telephone communication is organized using Avaya automatic telephone exchange. For ensuring smooth operation of the equipment the system of the selected power supply is carried out, the source of uninterrupted power supply of APC is set. The system of ensuring necessary climatic parameters of server is constructed using conditioners of Daikin.

"Specialists of system integration carried out expertize of the existing project. It was optimized due to deeper task analysis and optimal selection of the equipment. The customer received the solution which is most conforming to its requirements and the cost twice lower than initially assumed the project budget", – Natalya Maslennikova, the account director of system integration of NETA emphasizes.

"The problem of creation new was entrusted by SCS to NETA – the company having wide experience of implementation of similar projects and which well proved in the city of Mirnom. Thanks to professionalism and high qualification of specialists of NETA the task was solved extremely qualitatively. As a result of SCS of Administration conforms to all modern requirements and is one of the best in the area", – Ildar Sultanov, the head of the municipality notes Mirninsky area.

The NETA company has long and successful experience of cooperation with state structures and commercial enterprises of Mirninsky district. NETA implemented a number of large-scale projects for JSC ALROSA: restructuring of data networks on four industrial platforms of the company was carried out, the payment system on plastic cards, the ventilation and air conditioning system is created. For Mirninsky airline the corporate data network on the basis of which the video surveillance system and the system of intellectual conference loudspeaker communication are developed and implemented is built.