On Moldavian state district power plant installation of a structured cabling system is complete

Customers: Moldavian state district power plant

Dnestrovsk; Power

Contractors: To Inca (Ukraine)
Product: SCS projects and wireless network infrastructure

Project date: 2012/01  - 2012/06

Content

The company Ink completed the project of sale of a structured cabling system for Moldavian State District Power Plant Ltd. At the heart of the project creation of modern and reliable SCS in the building of the Integrated auxiliary body (OVK-1) of the thermal station.

Solution

During the project in the building of OVK-1 of the enterprise the principle of creation of SCS on the basis of the PAN-NET cable system on Panduit Corp technology which consists of a vertical subsystem (Building backbone cable subsystem) and a horizontal subsystem (Horizontal cabling subsystem) was implemented.

Opinion

Vladimir Narbutov, the director of the Odessa branch of the company Ink, noted: "Informatization of a power complex always requires the innovative solutions. Implementation of this project did not become an exception - on new SCS conferred heavy responsibility as creation of a system became the base for further development and effective work of the enterprise".

"Creation of a structured cabling system allowed to optimize technology processes of the enterprise that, certainly, increased efficiency of its work. Such transformations are necessary for development of a complex of power and ensuring complete approach to development of the industry", - Alexey Bazhutin, the head of information technology of Moldavian State District Power Plant Ltd emphasized.

Results

Implemented by SCS provides to the customer use of the IP telephony, full data exchange between the main divisions, creation of an information security system and monitoring and also implementation of a single system of security, i.e. integration of IT network and network of a security service.

Besides, in the project progress the power supply system is modernized, the systems of lightning protection and grounding are created.