Customers: Data-Port Voronezh; Telecommunication and communication Contractors: DataDome Product: Projects of creation of complex IT infrastructureProject date: 2011/12 - 2012/03
|
The Datadome company (DataDome) carried out a task of preparation and release of the project documentation of data center for provider of telecommunication services Data-Port.
Details
It is worth referring the fact that the put technical solutions and the project documentation allows to conduct construction of data center with the maximum level of scaling to features of this project. During creation of the project it was supposed that commissioning of each subsequent stage will not cause a stop in operation of already installed equipment. Such approach to creation of data center allows the customer to save on initial capital costs and to stretch them in time.
Solution
Physically the project of DPC of Data-Port represents two independent modules on 190 sq.m everyone, for installation of 106 server cabinets 42U high a format of 600х1000 mm and with an electric power of 5 kW on a cabinet. Modules of server premises and the premises of the UPS are executed from sandwich panels on a metalframework.
Term
Design is carried out to one stage. The beginning - December, 2011, end - at the end of March, 2012.