Poisk-Telekom (DPC projects of upgrade)

Customers: Poisk-Telekom

Moscow; Telecommunication and communication

Contractors: DataDome
Product: DPC Projects of creation and upgrade

Project date: 2012/04

The DATADOME company (DataDome Ltd) announces accomplishment of a task of carrying out independent assessment of engineering infrastructure of DPC for identification of deviations between project solutions and the implemented engineering infrastructure and also by determination of quality of the performed installation and construction works for local provider of telecommunication company services of Poisk-Telekom LLC (Chelyabinsk).

In a work progress expert evaluation of the existing engineering infrastructure of the operating DPC was made. Assessment was made on the basis of audit of the acting DPC, the executed measurements of parameters of the operating DPC, the provided work and executive documentation.

Visual inspection, including measurements of key parameters of work of the engineering systems of data center, was carried out according to construction solutions of DPC and also on its following engineering systems: cold supply, ventilation, power supply, uninterrupted power supply, back power supply (DGU), automatic gas fire fighting, smoke removal, the security and fire warning, video surveillance, control and access control, water supply and the sewerage, besides, on the structured cable network and on communication fiber lines.

On the basis of the data obtained during visual inspection of the platform and measurements of key parameters of work of the engineering systems and also on the basis of the studied project documentation outputs on quality, completeness of implementation of construction and installation of engineering infrastructure of DPC were created.

The conclusion about compliance to requirements of technical specifications of design and installation of an information and technology complex became result of carrying out independent assessment of engineering infrastructure of the existing DPC. The DataDome company developed the set of guidelines for reduction of the separate systems or their elements in compliance with requirements to their functioning, within the made project decisions and also the main risks for operability of DPC are defined, the recommendations about elimination or decrease in influence of risks within the made project decisions are developed and the conclusion about compliance by it the engineering systems of DPC is prepared. All works were carried out by DataDome company within one week.

Key parameters and technical parameters of DPC Poisk-Telekom:

  • The total useful area of DPC – 290 m ²
  • The selected premises for the server hardware – 2 turbine halls of 54 m ²;
  • The selected premises of the UPS (electropanel board) - 2 halls of 21.2 m ²;

rooms of communication No. 1, No. 2 - of 12.3 m ²;

  • The quantity of server cabinets on the project – 32 pieces, is mounted on the 1st stage of-8 pieces;
  • The quantity of telecommunication cabinets (on the project) – 4+2 pieces, is mounted on the 1st stage - 2 pieces;
  • The total design electric power of the server hardware – 631.2 kW,

742.6 kVA (complete development of DPC).