The Russian television and broadcasting network continues the project of equipment by the systems of back supply

Customers: Russian television and broadcasting network (RTRS)

Moscow; Telecommunication and communication

Contractors: Technoserv
Product: Complex projects of creation of the engineering systems

Project date: 2013/01  - 2014/04
Project's budget: 194000000 руб.

Content

The Technoserv company announced on July 25, 2012 contract signature on accomplishment of a complex of works on design and supply of equipment for reserve power supply of technology equipment of Federal State Unitary Enterprise RTRS.

Goal

The contract is signed based on the open competition held by RTRS. The cost of the performed works will be about 51 million rubles. The project covers 8 federal districts of Russia: 29 objects belonging to 19 republican, edge and regional radio teletransmitting centers (RTPTs) which are the RTRS regional branches are subject to reconstruction. All complex of works will be executed within 5 months from the date of contract signature.

Within the contract Technoserv will execute a full range of works on design and delivery. So, the integrator will develop for each of objects a complete set of the project and work documentation of reserve power supply of technology equipment using the diesel generator sets (DGS) of production of FG Wilson company (Great Britain). Besides, Technoserv will provide approval of the developed project documentation in bodies of Rostekhnadzor and Rospotrebnadzor.

Opinion

"Projects in the field of power – one of the important and actively developed activities of Technoserv. Considerable experience of design and "turnkey" creation of autonomous sources of electrical and thermal energy – power plants, the power centers and mini-combined heat and power plant based on gas, gas-piston and diesel power stations – allows the company to develop for each client an optimal energy efficient solution in the short time", – Sergey Korneev, the managing director of Technoserv commented on the project.

2013. Project Development

The Technoserv company announced on January 22, 2013 contract signature on accomplishment of a complex of works on design and delivery of diesel generator sets for reserve power supply of technology equipment of Federal State Unitary Enterprise Russian Television and Broadcasting Network.

Tender

Contracts are signed based on the open competitions held by Federal State Unitary Enterprise RTRS. Total cost under contracts was 194 million rubles. The project provides reconstruction of 82 objects belonging to 28 republican, edge and regional radio teletransmitting centers (RTPTs) - to the RTRS regional branches – in 7 federal districts (generally in Siberian, Ural, Far East and the Northwestern Federal District).

The complex of works includes delivery to objects of RTRS of the completed diesel generator sets (DGS) with automatic panels of switching of loading, development of the project documentation, its approval of relevant organs of Rostekhnadzor and Rospotrebnadzor.

About brands

As a reserve source of power supply of the RTRS engineering systems diesel power stations with the diesel generator set of production of FG Wilson company (Great Britain) with power from 15 to 250 kVA (depends on an object), are selected from an all-weather container. For automatic temperature monitoring and its maintenance at the set level cooling systems, heating and ventilation are provided in containers, also containers will be equipped with the system of protective shutdown, a grounding system, the system of the security fire warning and access control, the two-level automatic fire-extinguishing system and signallings, the system of the general and emergency lighting, etc.

"Design and turnkey creation of sources of electrical and thermal energy of the most different level (from several tens kilowatts to tens of megawatts) – one of core competencies of Technoserv, – Dmitry Butorin, the head of small-scale power generation of Technoserv integrator noted. – The complexity of this project consists in the wide geography requiring difficult logistics and harmonious work of a command. However the company already has a successful experience of implementation of the similar project on reconstruction of a system of reserve power supply of 29 objects of Federal State Unitary Enterprise RTRS in all 8 federal districts of Russia. All project works then were performed precisely and at the scheduled time that was appreciated by the customer".

For information only

During 2012-2013 the amount of contracts on this integrator was 245 million.