The center of computer-based training at MSTU of N.E. Bauman continues re-equipment of the engineering systems

Customers: The specialist, the Center of computer-based training at MSTU of N.E. Bauman

Moscow; Science and education

Contractors: LanKey
Product: Complex projects of creation of the engineering systems

Project date: 2013/07  - 2013/09

Content

The LanKey company executed installation of the engineering systems and set internal and abnormal emergency lighting in new classes of the Center of computer-based training Specialist at MSTU of N.E. Bauman.

Solution

By request of the Center of computer-based training Specialist the LanKey system integrator implemented the project on equipping of six classrooms utilities, organized the lighting conforming to domestic and international standards.

The structured cabling system (SCS) and power supply system are in a short space of time mounted, active equipment is installed and configured, the conditioning system and internal, abnormal emergency lighting is connected. Besides, specialists of LanKey connected the projectors and the presentation equipment necessary for effective educational process.

Taking into account specifics of professional activity of the Customer, the LanKey company performed works according to state standard specifications meeting all safety requirements.

Works were carried out in the period May, 2012 - August, 2012.

2013: Project Continuation

On October 23, 2013 the LanKey company announced completion of works in the educational complex located at the address: Radio St., 24, building 1.

Project Tasks

There was a need to carry out works on installation of a structured cabling system, a power supply system and installation of additional points of lighting. Complexity of project implementation in need of connection of additional jobs from the existing boards of power supply and server and also in non-standard architecture of premises.

With development of Spetsialist training center, in 2013, there was a need to equip educational audiences with the engineering systems. The contractor on the project invited LanKey system integrator.

Project Progress

Within the project specialists of LanKey mount a structured cabling system, a power supply system, additional points of lighting are set. 175 additional jobs are set.

Works are performed with observance of standards, according to contractual terms. The electric and structured cable systems are tested, results of testing are reported to the customer.