Project

Alfa-Bank carries out hardware of new DPC

Customers: Alfa-Bank Russia

Moscow; Financial Services, Investments and Auditing

Contractors: Insystems
Product: Complex projects of creation of the engineering systems

Project date: 2012/01  - 2012/08

The INSYSTEMS company equipped new computer center of ALFA-BANK.

Solution

Specialists of INSYSTEMS company finished the project on equipping of computer center of ALFA-BANK. Modern engineering infrastructure of the new center allows to provide smooth functioning of the responsible equipment of IT systems of bank.

Configuration

The new computer center of ALFA-BANK represents the three-storyed building equipped with a full range of the engineering systems with a possibility of control of their status 24 hours a day.

Functioning of all information system of bank depends on operability of computer center which guarantor is correctly organized engineering infrastructure. The complex of life support systems of the center including systems was developed for maintenance of favorable conditions for operation of the equipment by INSYSTEMS company: the conditioning guaranteed and regular power supply, ventilation, smoke removal, heating and the system of construct (raised floor). For smooth functioning of the equipment in the conditions of blackout two 1650 kW diesel generator sets (DGS) everyone are installed. Both DGU are executed in container execution, they are located in the territory of the building and if necessary can be moved. And for the purpose of quality improvement of power supply and level of fault tolerance of power supply of the building on segment "transformer substation – the main distribution frame" the system of the busline is installed.

The compulsory provision of ensuring operability of the equipment is maintenance of certain temperature conditions and level of humidity. A conditioning system and all-exchange ventilation, set indoors, provide separation of the turbine hall into cold and hot corridors, the cold air moves under a raised floor, and warm air gets because of a drop ceiling.

All engineering systems of computer center are integrated into a uniform complex. Works were carried out in tough time and administrative frames.

Vladimir Dergachev, the director of Directorate of maintenance of infrastructure of information technologies of ALFA-BANK noted:
"In implementation process of the project the INSYSTEMS company showed flexibility and pro-activity, both at design, and at creation of engineering infrastructure of new computer center of ALFA-BANK. For us as for customers informal approach from employees and heads of a command was very important INSYSTEMS at each stage of the project".
Alexey Zhitlov, the director of Directorate of support and development of infrastructure of business of ALFA-BANK added:
"Works were performed according to technical specifications and terms of the contract, with proper quality and at the scheduled time. In a work progress our wishes, employees INSYSTEMS quickly were as much as possible considered resolved the arising technical and organizational issues. During project implementation specialists of INSYSTEMS company proved as professionals of the high level".
Evgeny Virtser, the CEO summarized INSYSTEMS:
"During the work on an object of new computer center of ALFA-BANK our specialists paid special attention to the choice of components of engineering infrastructure of the equipped premises. All installed systems are executed on the basis of modern developments in the field of the engineering systems. I hope that such competent and qualified approach to work fully satisfied the management of bank. Now our cooperation continues also on other objects of ALFA-BANK.