Developers: | Ante Mediam |
Technology: | DPC |
Feature of Park - the level of reliability Tier III that provides unceasing rendering the services provided based on DPC at removal from operation of any component of engineering infrastructure of the data-center. At the same time the indicator of availability is 99.982%, i.e., total idle time of systems cannot exceed 1 hour 35 minutes a year.
Scales of this data-center: total area – 2715 sq.m. on which 14 machine halls on 400 cabinets are located, the total maximum power of DPC - 4 MW, IT loadings — 2.4 MW. Power of the cooling system is 2.4 MW. The DPC own fiber-optical network provides powerful data transmission channels and Internet access and also communication with other points of exchange of traffic. Each cabinet is expected placement of the equipment with the general energy consumption to 8 kW. Physical infrastructure of DPC is implemented on the basis of the complete solutions Schneider Electric, in particular a hardware basis of an inzhenernoyinfrastruktura of the data-center is the building block system of APC InfraStruXure.
Services based on the commercial cloud data-center Park: since lease of virtual servers and physical places in racks and finishing with a possibility of creation of certain machine halls and lease of own complex virtual data-center. Except high-technical equipment, Park offers services of skilled staff for its service that allows to receive 24/7 high-quality services without charges by the client of own service of operation.