Project

Rosa Khutor, the company on development of ski resort (Cisco LAN Management Solution (LMS))

Customers: Rosa Khutor

Contractors: Infromsvyaz Holding
Product: Cisco LAN Management Solution (LMS)

Project date: 2012/09

Based on the held tender for equipment of the resort of Rosa Khutor the INFROMSVYAZ company (Moscow), and as a technology basis – the equipment Cisco was selected. Because construction of the resort is conducted in several stages, it was important that network infrastructure initially provided gradual input of different services of communication and inclusion of business processes on demand.

The contractor of the project carried out complete installation of optical lines of communication, having provided full redundancy of channels due to application of a ring topology of network. As a core of network and for traffic distribution the Cisco switches Catalyst 6509E having 10 built-in ports Gigabit Ethernet and also 9 connectors for installation of add-on switching modules were used. These switches provide safe data transmission on IP networks and firewall, the system of protection against invasions, the organization of the protected VPN connections, the analysis of network and also acceleration of the Secure Sockets Layer (SSL) connections create the platform for additional services, such as processing of content.

Network management was implemented based on the product Cisco Lan Management Solution (LMS) which provides to administrators a graphic cover for control of all equipment, automatically determining connections of client PCs and IP phones, and the Cisco ASA5580 system allowing to provide safe transfer of traffic with a speed up to 20 Gbps on each device is applied to ensuring adaptive information security, servicing up to 2 million independent communication sessions at the same time. For connection to trunk communication channels the Cisco ONS 15305 Multiservice Provisioning Platform (MSPP) platform which allows to aggregate all types of traffic for transfer through external fiber optic connections was used.

Upon completion of the project in December, 2010 a system underwent engineering inspection, and in February, 2011 all opportunities and advantages of this communication could be checked in practice at a stage of the Russian Cup and the European cup on mountain skiing which passed on constructed a route of the resort of Rosa Khutor.