Customers: Gidromontazh trust Selyatino; Construction and industry of construction materials Contractors: LanKey Product: Complex projects of creation of the engineering systemsProject date: 2013/02 - 2013/04
|
The LanKey company announced on April 19, 2013 end of the complex project on installation of a structured cabling system, a power supply system and automatic telephone exchange for JSC Gidromontazh Trust.
Construction
In office spaces of the customer it was necessary to carry out mounting works of a cable system, electric infrastructure and the organization of telephony.
The office is located in the building built in the sixties the 20th centuries. It was required to dismantle outdated utilities, to construct new and at the same time to save a general architecture. Besides, on an object finishing works were conducted - installation of the engineering systems should be conducted in approval of repair crews.
Job
Works are performed with respect for the international and domestic standards, according to the stipulated terms.
To SCS it is provided with the certificate for 25 years of a system guarantee, the electrical system of office passed test by laboratory, test results are provided to the customer. The automatic telephone exchange is mounted, configured and put into operation.