Customers: Promsvyazbank (PSB) Moscow; Financial Services, Investments and Auditing Contractors: Technoserv Product: Complex projects of creation of the engineering systemsProject date: 2013/01 - 2013/04
|
The Technoserv integrator completed upgrade of the engineering systems of the main DPC of Promsvyazbank, the press service of the company reported on April 23, 2013.
Project
As a part of the complex project of upgrade of DPC - audit of the existing engineering systems, IT resources, design, step-by-step transfer of IT infrastructure of bank from DPC on the platform of the reserve telecommunication center of Promsvyazbank without interruption in rendering services and losses of business process management, supply of equipment, accomplishment construction and balancing and commissioning and also comprehensive tests of the engineering systems of DPC and the return transfer of IT infrastructure on the main platform.
Solution
Within the project the contractor performed works on replacement in the building of DPC of a full range of the engineering systems – power supply, conditioning, fire extinguishing and security. At the same time, earlier not demanded premises are equipped under server rooms - the useful area of DPC is expanded up to 180 sq.m., and power consumption increased up to 500 kW. All engineering systems are integrated into a uniform complex and provide a possibility of operational expansion.
Project implementation took about 12 months.
Readiness
Project implementation upgrades the systems of the guaranteed and uninterrupted power, the structured cabling system, the systems of lightning protection and grounding, automated systems of air conditioning and gas fire extinguishing and also a control and management system for access (ACS), the system of prevention of leakages are completely updated. At the same time the main nodes of a system of automatic equipment are duplicated and constructed using solutions of leading manufacturers of the equipment - ABB, Finder, WIKA, WAGO, Danfoss, and technological solutions of such vendors as Airedale, APC by Shnider Electric, Rittal, Stulz, Conteg were applied to creation of an engineering complex.
"Upgrade was carried out within the strategy of development for infrastructure of Promsvyazbank existing at us. Requirements for reliability assurance in work of large financial institution and also business challenge of Bank on development of the business and ensuring high-quality service of our clients are the basis for this strategy, – Sergey Sayutin, the associate director of department of information technologies of Promsvyazbank noted. – Now our DPC represents the intellectual building, all engineering systems are strengthened and reserved, the area of server premises is considerably expanded. The Technoserv company and group of engineers from our Bank successfully coped with the task set for them".
"It is successful, first of all, our experiment on implementation of such projects for such large companies and the organizations as, for example, Technopark Mordovia or Tele2 Russia helped to cope with an assigned task. At the same time we constantly increase the level of execution of projects, including, involving examination of the foreign companies to the solution of specialized tasks. So, for the Russia's first implementation of technical solution on the system of parallel control of chillers (the cooling installations are a comment of TAdviser) we consulted with the British specialists of Airedale company", - Evgeny Zakrepin, the first deputy managing director of Technoserv company emphasized.