Customers: VPK-Telecom Moscow; Telecommunication and communication Contractors: DataDome Product: Projects of creation of complex IT infrastructureProject date: 2013/01 - 2013/06
|
The Datadome company (DataDome) announced the project of construction of DPC for VPK-Telecom on June 11, 2013.
Implementation
For June 11, 2013 specialists of the contractor approached a closing stage of installation of equipment for DPC of the customer and in the nearest future are going to put data center in operation.
Details
In the project progress a number of difficulties of technical character is solved: the building where the DPC site for construction is deployed, belongs to the category enough old (the building of construction of the 1970th years on Leningradsky Avenue), nevertheless, all necessary preparatory work for ensuring the guaranteed implementation and smooth operation of the latest equipment of a data processing center of the Tier 3 level, according to the last Uptime Institute standards is performed. In addition, all loading, unloading, mounting, works on approval are implemented in time.
Before works experts of Datadome (DataDome) carried out works on audit and examination of the premises. Power capacity of the building is checked for durability and tested. Considering architectural features of the building, external blocks of conditioning are placed on a peaked roof using the frames placed in garret overlappings.