RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Russian Railways conduct upgrade of the communications electric power systems

Customers: Russian Railways (RR)

Contractors: LANIT
Product: VPN projects

Project date: 2007/03  - 2013/09

The LANITH DV company in 2013 upgrades infocommunication infrastructure of JSC Russian Railways at 12 stations of section Bikin (Khabarovsk Krai) – Ruzhino (Primorsky Krai) and 10 more stations in the territory of Khabarovsk Krai, the press service of the company integrator reported on August 6, 2013.

Project Background

Cooperation LANITH DV and the Russian Railway continues since 2007. During this time frame 109 stations and 5 houses of communication of carrier are upgraded: an overhaul of the park systems of the loud notification, posts of electric centralization is made, building of technology communication, construction of the fiber-optic communication line and installation of automatic telephone exchange is made.

Project Progress

Overhaul of the bilateral park system of the loud notification (PSLN) is made at 24 stations: on sections Artyom – Angular, Coal – Vladivostok, Coal – Ussuriysk, Artyom-1, Artyom-2, Artyom-3, Shkotovo and Smolyaninovo. The PSGO system is constructed using stationary communication systems, a wired network of communication and loudspeakers.

For laying of PSGO the SMK-30 multiplexers created by domestic manufacturer in Penza were used. The equipment is the single technology platform capable in a complex to solve telecommunication problems at the modern level.

LANITH DV repaired posts of electric centralization at 57 Russian Railway stations. Works are continued at 20 stations. An overhaul of five houses of communication – at stations Khabarovsk II, Tynda, Coal, Nakhodka and Spassk-Dalny is made. Specialists LANITH DV constructed communication fiber lines, replaced aluminum cables with copper and installed SMK-30 multiplexers. For functioning of the equipment it was required to set power cabinets of power supply of the automatic input of a reserve (AIR) on three inputs.

LANITH DV built lines of technology communication on sections Ussuriysk – Hasan-3 starting with a scope of 15 stations and Sibirtsevo – Novochuguyevka-2 with a scope of 11 stations.

Vadim Topekha, the key clients manager LANITH DV, noted: "The purpose of all projects implemented by our company in cooperation with Russian Railway – the organization of the communications electric power systems. In essence it is the unique project as huge work on recovery and improvement of modern communication systems with a scope of all Far East railroad passing across territories of Seaside, Khabarovsk regions and the Amur region is done".