The Maryinsky Theater equips a scene with the system of reliable power supply

Customers: State Academic Mariinsky Theatre

Product: Complex projects of creation of the engineering systems

Project date: 2013/06  - 2013/10

On October 10, 2013 the Schneider Electric company reported - the firm acts as the contractor in the project of installation of equipment for reliable power supply of the second stage of the Maryinsky Theater and the next consumers.

Project Progress

Within the contract Schneider Electric installs own equipment for electric power distribution from transformer substations to boards of secondary distribution and an automated system of fire extinguishing. In particular, Trihal transformers, cabinets of Okken and Prisma Plus, Xenta controllers.

For the first time I-line II buslines on 6300 A with the concept of the uniform grounding bus are involved in Russia at development of the system of power supply of Mariinsky theater-2. This installation provides efficiency of connection, protection of personnel and the equipment from defeat with electric current. The I-line II busline integrates such advantages as low resistance of contacts from copper and ease of aluminum that provides high efficiency of a power distribution system.