Customers: Ochakovo MPBK Beer and soft drinks plant Contractors: PromSystem (Promsystem, before Promavtomatization) Product: ProLeiT brewmaxxProject date: 2013/08 - 2013/11
|
On November 29, 2013 the PromSystem company announced end [1] to the project of carrying out migration of a management system with ProLeiT v.4 on ProLeiT brewmaxx v.8 in department of filtering of MPBK Ochakovo Ltd.
Project Progress
During the project the company contractor drew conclusions on a possibility of use together with ProLeiT brewmaxx the control SIEMENS devices SIMATIC S7-400 Rockwell Automation, VIPA and Mitsubishi Electric.
As a result, work on replacement of the hardware-software platform helped:
- Eliminate the existing defects of algorithms of interaction of the equipment of department of filtering, and as a result – to increase reliability of system operation.
- Expand possibilities of operation personnel on tracking of a system status and control of the equipment.
- To automatically create reports for work of the equipment and to archive all technology data.
- Simplify process of integration of new elements (equipment) into a system.
- Simplify the system of providing production reports.
- Simplify system maintenance of management.
- In the future to have an opportunity to make interface to MES- and ERP systems.
Migration from the ProLeiT v.4 system on the ProLeiT brewmaxx v.8 DCS system provides conditions for further integration into [2] of other technology sections of production at present working under control of a complex different SCADA systems with a possibility of their transfer to a single platform that as a result will increase efficiency and will have a positive impact at work of production processes.