[an error occurred while processing the directive]
RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

EKF electrotechnica implements a management system for warehouse logistics

Customers: EKF electrotechnica (EKF of the Electrician)

Contractors: LogistiX
Product: Lead WMS

Project date: 2013/07  - 2014/02

On February 6, 2014 the LogistiX group announced automation of work of the logistic center of Electrician's EKF company. The project is implemented in the Moscow region using an adaptable management system of LEAD WMS.

Project Results

As a result of implementation of WMS - a system, the overall performance of warehouse transactions increased by 80%, the speed of a complete set and control of orders grew twice. The number of claims from clients decreased by 4 times. Thanks to WMS processing the tovaropotka is provided by 2.5 times with smaller staff, than to system implementation of management.

For February 6, 2014 the WMS system helps to manage all processes of operational logistics of a warehouse complex, providing automatic scheduling of tasks in real time. The logistic center has the total area more than 7.5 thousand sq.m, rack and shelf sections (mezzanine), about 4 thousand active nomenclature positions work with the range. Besides, in a complex there is a specific site for processing lengthy and products with non-standard dimensional characteristics.

Partners in the project made the considerable amount of changes in technology of cargo handling. Specialists of LogistiX coped with an assigned task, throughout the project providing necessary consultations and data on possible risks.

"The feature of the project more consisted not in technical, and in a technology component. The customer moved to a new warehouse complex with absolutely other technology of work. Our implementation methodology considers similar situations, and allowed to react to needs of the client timely. There is a separate wish to note, in our opinion, outstanding organizational capabilities of leadership team and founders of Electrician's EKF company who were connected to the project at certain stages, and provided the necessary level of support in return", - Dmitry Blinov, the technical director of the company of LogistiX noted.