Customers: Bashneft-Novoil Contractors: Neolant Product: Neolant InterBridgeProject date: 2013/04 - 2014/09
|
On February 25, 2014 it became known of development of Neolant company - information 3D model of the hydrogen production installation (HPI) for oil refinery of Bashneft-Novoil company. On its basis the information technology platform using engineering data for solving of tasks of management at all stages of lifecycle of an object is created.
Project Results
Object model saturation - more than 130 thousand elements. Project implementation for timely identification of the collisions capable to slow down construction process, will help the customer to avoid increase in terms of construction of the facility and reduction of non-productive costs of financial and labor resources.
The three-dimensional information model Neolant is used at design of an object "Hydrogen production installation" of ANC Bashneft for integration of the design data obtained from different subcontractors, control of result of project works, optimization of works on designer's service and also for information exchange with the customer and the construction organizations.
"By means of use of information modeling the total ownership cost of UPV will be reduced, - Shalbus Karibov, the director of the department of oil and gas of Neolant company noted. - Information 3D model from Neolant is a huge archive of the visualized information with the built-in management tools it, simple and convenient. Both the current status of an object, and all the entered, made and planned changes is reflected in it. It is the effective mechanism for management of lifecycle of all enterprise. Already now economic effect of use of information modeling is notable — the customer saved on elimination of collisions and reduced terms of construction of an object".