"The southern Yakut electric networks" completed reconstruction of VL

Customers: Southern Yakut electric networks

Aldan; Power

Contractors: LANIT
Product: Complex projects of creation of the engineering systems

Project date: 2012/06  - 2013/11

On March 24, 2014 specialists of LANITH DV company announced reconstruction high-voltage line No. 117 "to ORU of 110 kV of NGRES – PS No. 40 Enrichment factory for needs of "Southern Yakut Electric Networks" company - branch of Far Eastern Distribution Network Company.

Project Results

Implemented by the project a lightning rope replaced with a lightning rope with the optical cable.

Route extent – 18.4 km. In addition to the main route connecting Neryungrinsky state district power plant and substation No. 40 specialists LANITH DV executed runs on substation No. 42, repair and production base No. 3 of "The southern Yakut electric networks" and substation No. 47.

A system is implemented for needs of supervisory control, channels of system automatic equipment and relay protection. Premises of communication on substations are equipped the systems of regular power supply, maintenance of climatic conditions, a communication equipment and data transmissions.

A system will help with remote monitoring of work of substations and prevention of emergency situations in localities which are provided by Neryungrinsky state district power plant.