RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Lukoil-Volgogradenergo (SAP R/3)

Customers: Lukoil-Volgogradenergo

Volgograd; Power

Contractors: EAE-Consult
Product: SAP ERP
На базе: SAP NetWeaver

Project date: 2013/03  - 2016/09
Number of licenses: 100

2016: Implementation of mobile application for monitoring of technical and economic indicators

In 2015-2016 the EAE-Consult company implemented the project on implementation of mobile application "Monitoring of technical and economic indicators of the enterprise" in Lukoil-Volgogradenergo LLC company.

Technical and economic indicators of thermal power plants (thermal power plant)

Mobile application is intended for visualization of hour indications of the key technical and economic parameters of TPP to time with a possibility of viewing historical data for the last calendar week by means of the mobile device at the moment.

The appendix is contained by the phonebook of the enterprise and allows to analyze the following indicators:

  • Electricity production and specific fuel consumption.
  • Electric load.
  • Maintaining operation mode of TPP.
  • Temperature diagram of a heating system.
  • Gas consumption.
  • Meteodata – the direction of wind, wind speed, humidity, pressure, air temperature, a dew point.
  • Status of the capital equipment.
  • Economic indicators.
  • Marginal income.

Main users of the application: heads and technicians of the company.

Information on a status of the Volgograd and Kurgan combined heat and power plant in real time on screens of mobile devices

Project Results

At the enterprise of customers reliable solutions for acceleration of digital transformation, operational exchange of production data, ensuring the round-the-clock monitoring of key indicators of the company from any place in the world for acceptance of optimal management decisions are implemented.

2013: ERP SAP implementation