RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Reneyssans Konstrakshn (BI)

Customers: Renaissance Construction (Reneyssans Konstrakshn)

Real Estate

Contractors: Lasmart
Product: Microsoft SharePoint Server 2013
На базе: Microsoft SharePoint

Project date: 2013/07
The project team from the customerIntegrator Consultant
Farrukh Hakimov (project manager)
не указана

Project Tasks: Implementation of the consolidated system of the analytical and management reporting. Optimization of work with remote offices.

Project Description:

During the project the consolidated data warehouse integrating all necessary data sources was built: 1C 7.7 – data on personnel and settling with partners, 1C 8.2 – data on personnel and settlings with partners, ITWO - data on budgeting and project management, in total – 7 sources. For further work data were loaded into the analytical models developed according to requests of the Customer and allowing to work quickly with data in any cuts.

Due to the wide geography of working objects, it was necessary to organize the accessibility to the reporting in the remote mode. For these purposes reporting system on the basis of Microsoft SharePoint Server 2012 was implemented.

For the staff of the central office access to analytics and the management reporting was organized by means of the Microsoft Excel interface.

Project Results:

Implemented by Lasmart company reporting system based on Microsoft SQL Server technologies became the main source of information for analysts and managers. A new system considerably reduced time of decision making, preparation of the reporting, lowered errors of "a human factor" and gave the chance of obtaining reliable information about a business status in short terms. Besides use of a centralized system of the reporting considerably lowered load of the ERP system.

Customer Feedback:

"System implementation of the analytical and management reporting allowed to optimize considerably operating time of employees and as the average time of a response of a system to requests is 4 seconds. All necessary information is available to the analysis from a uniform source now and represents detailed and reliable information", - Farrukh Hakimov, the Project manager of implementation the ERP system comments.