Project

Implementation 1C: Enterprise 8.2 in Nytva company

Customers: Nytva

Nytva; Metallurgical industry

Product: 1C: Enterprise 8.2
На базе: 1C: Enterprise 8.0

Project date: 2013/02
Number of licenses: 100

Content

The Following Functions Were Automated

  • Different industry specifics
  • Production, services
  • Calculation of normative cost value
  • Personnel management and personnel records (HRM)
  • Time recording
  • Finance, management accounting, monitoring of indicators
  • Accounting is accounting, tax, budget, including the regulated reporting
  • Accounting
  • Production operations
  • Other
  • Other opportunities

Other automated functions

Subsystems are developed: regulations of work and calculation of the planned salary, planned cost calculation, accounting of the actual development and calculation of KTU. And also additional objects for automation of time keeping using the data which are saved up in the created subsystems are created.

Work on the Adaptation of the Standard Solution

Development of a subsystem of regulation of work and calculation of the planned salary (period of execution of works of 2010) (start date of commercial operation of 5/1/2010) Development of a subsystem of planned cost calculation using data of a subsystem of regulation with saving the results of calculation in standard and additional non-standard objects (the period of execution of works of 2010-2011) (start date of commercial operation of 5/1/2011) Development of a subsystem of accounting of the actual development and calculation of KTU (accounting of the actual development and calculation of KTU at accomplishment of the normalized and not normalized technology transactions, settings of the equipment, other works) (the period of execution of works of 2011) (start date of commercial operation of 1/3/2012) Automation of time keeping using additional objects, on the basis of the given subsystem of accounting of the actual development and calculation of KTU, with unloading of data in the external program (the period of execution of works of 2012) (start date of commercial operation of 2/1/2013)

Maintenance

The paid agreement 1C:ITS is issued

Description

Were the reasons of implementation of 1C: Manufacturing Enterprise Management 8: need of obtaining operational information about a business status, flexibility of accounting, the intuitive interface, a possibility of adaptation taking into account specifics of activity of the Customer. Specifics of work and requirements to the automation system for this enterprise are explained by the specific internal instructions and rules adopted at the enterprise, checked by time. Status of implementation of 1C: Manufacturing Enterprise Management 8: significant stages are completed (the considerable number of subsystems is automated). Necessary adaptation of the standard solution is executed, user training is provided. As a result of implementation the enterprise taught a powerful planning tool, control and the analysis of activity. In the closest plans of the enterprise after development of a system automation of payroll appears.

The Following Tasks Were Performed

Collecting and requirement analysis of the customer to an automated system Planning of stages of works, drawing up job schedule Technical implementation of specific features of accounting and management in the automation system (adaptation)