Project

Novatek Tarkosaleneftegaz

Customers: Novatek Tarkosaleneftegaz

Gas industry



Project date: 2014/06

According to technical specifications of Novatek — TARKOSALENEFTEGAZ LLC, on production capacities of JSC Gazprom avtomatizatsiya two sets of the equipment intended for back supply of a system of linear telemechanics of the gas pipeline and the automated control system for installation of preliminary preparation of gas of North Hancheysky and Hadyryakhinsky license areas are made. The set of the equipment includes two independent AIP-2000 power sources and two module containers Meridian.

As a part of AIP-2000 use of GTEG-200 generators as the main and reserve power capabilities is provided. Application in self-contained AIP-2000 power stations of GTEG-200 generators provides:

  • life of installation before an overhaul not less than 15 years;
  • possibility of use of the equipment in climatic conditions from - 60 °C to + 50 °C due to utilization of the generated heat (up to 2.5 kW) on heating;
  • unpretentiousness to composition of gas and also optimization of its expense.

The equipment made according to technical specifications of Novatek — TARKOSALENEFTEGAZ LLC is certified and included in the register of the equipment recommended for application in JSC Gazprom. Start-up of an object is planned for October, 2014.