New Voronezh nuclear power plant (Database on decommissioning of blocks of the NPP (IC BDVE))

Customers: New Voronezh nuclear power plant

Contractors: Neolant
Product: Database on decommissioning of blocks of the NPP (IC BDVE)
На базе: Bentley ProjectWise

Project date: 2014/01  - 2014/05

On June 24, 2014 the NEOLANT company announced the project of decommissioning (VE) of power units of the New Voronezh nuclear power plant from the structure of JSC Rosenergoatom Concern.

Project Results

As a result of project implementation, the IC supports feature set:

  • collecting and preserving of all necessary project, design and other engineering documentation up to project finish on VE;
  • data exchange with the information systems operating on the NPP;
  • information support for the automated development of the documents required during decommissioning of blocks of the NPP including drawing up reports on technical condition of blocks;
  • accumulation and integration of information on a status of radioactive waste (Russian joint stock company) and spent nuclear fuel (SNF);
  • evident visualization of structure and structure of power units and objects on the NPP platform.