[an error occurred while processing the directive]
RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

SAP Multiresource Scheduling (SAP MRS)

Product
Developers: SAP SE
Technology: EAM,  ERP

SAP Multiresource Scheduling is schedule system and distributions of human and production resources at the level of jobs and groups: assessment of qualification, availability, loading and other parameters.

SAP MRS — the effective solution for service maintenance, maintenance and project management providing:

  • human resources management
  • object management of infrastructure
  • management of working time
  • management of the production technology
  • the manual, automatic and optimized planning
  • integration with geographic information systems
  • integration into mobile devices

SAP Multiresource Scheduling is integrated with key processes of SAP solutions:

  • SAP HR
  • SAP PM/CS
  • SAP PS
  • SAP cProjects
  • SAP CRM Service


Overview of the scenario Multiresource Scheduling

General architecture


Main Functions

Management of employment

  • Planning and distribution at the level of jobs
    • Ÿ Balancing of employment by replanning
    • Adding of resources

  • Workload at the level of groups

Ÿ ** the Planned and unplanned orders Ÿ ** Availability of employees (the planned busy time, absence, presence)

Monitoring

  • Execution control
  • Status of availability of tools

Skills management

  • Integration with SAP of HR/qualification MRS

Integration with management of working time of personnel

  • The bidirectional interface with SAP HR (absence, presence, substitution)
  • Information on changes from SAP HR

Graphic panel of planning

  • Functional panel of planning on the basis of SAP GUI
  • Simple panel of planning on the basis of a web user interface

Optimizer

  • The mechanism of the optimizer creates daily planning on the basis of parameters of "costs"

Integration into mobile devices.