RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

The Kristall sports palace is equipped with own DPC

Customers: Crystal, sports palace

Yuzhno-Sakhalinsk; Show business, leisure, sport

Contractors: Crillon Service
Product: Projects of creation of complex IT infrastructure

Project date: 2014/06  - 2014/12

On January 22, 2015 it became known of the project of creation of a data processing center for Kristall sports palace. Contractor of the project Crillon Service system integrator.

Project Results

The data processing center processes and analyzes information arriving from 140 surveillance cameras mounted both in premises and on the open areas. The basis of a data processing center was formed by Cisco switches and the Cisco UCS servers of series C.

Kristall sports palace, 2014

Management of the solutions Cisco UCS is implemented using the Cisco Integrated Management Controller (CIMC) interface which is built in servers. It gives the chance to integrate servers, networks, access to storages and virtualization in the uniform infrastructure providing decrease in total cost of ownership and increase in flexibility of activity of the palace.

Transport infrastructure for a video surveillance system is created on the platform of the Cisco switches Catalyst.

"Without a reliable server part the modern system of security video surveillance which is completely integrated with access control and ticket sales system just could not carry out the tasks. The basis of a data processing center was formed by the solutions Cisco differing in the high performance, reliability and simplicity of management" — Andrey Romanovsky, the associate director of Kristall sports palace noted.