RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

BEZRK-Belgrankorm, agro-industrial holding (1C Logistics: Management of a warehouse (1C: WMS))

Customers: BEZRK-Belgrankorm, agro-industrial holding

Food industry

Contractors: Axelot
Product: 1C: WMS Logistics. Warehouse Management

Project date: 2014/01  - 2014/04

Content

Project Tasks

  • Develop functionality and business process of the movement of goods in a warehouse
  • Increase capacity of a warehouse
  • Reduce time of acceptance and shipment of goods
  • Reduce dependence on personnel
  • Increase selection accuracy
  • Reduce quantity of errors
  • Arrange accounting of goods on expiration dates
  • Integrate WMS "1C Logistics: Management of warehouse 3.0" with the system of processing Marel and "1C: Trade Management"

Project Features

  • Food with an unstable weight are stored in a warehouse
  • Work with goods of different temperature conditions
  • Lot-based accounting
  • Storage ranges on expiration dates for goods in one cell

Project Results

  • Speed of acceptance increased twice, selection and shipment — by 4 times
  • Capacity of a warehouse increased
  • Storage on expiration dates is arranged
  • Uninterrupted goods acceptance from production lines is provided
  • Accounting on the weight and the number of places is developed
  • Opportunity placement through transits is implemented
  • Reservation of cells under the order on the amount and an order of shipment in run is performed
  • The dependence on personnel is reduced
  • Double entry of information is eliminated
  • Integration with the system of processing Marel and "1C: Trade Management" is developed
  • 2 stationary and 15 mobile jobs with connection of radio data collection terminals are automated