Project
BEZRK-Belgrankorm, agro-industrial holding (1C Logistics: Management of a warehouse (1C: WMS))
Customers: BEZRK-Belgrankorm, agro-industrial holding Contractors: Axelot Product: 1C: WMS Logistics. Warehouse ManagementProject date: 2014/01 - 2014/04
|
Project Tasks
- Develop functionality and business process of the movement of goods in a warehouse
- Increase capacity of a warehouse
- Reduce time of acceptance and shipment of goods
- Reduce dependence on personnel
- Increase selection accuracy
- Reduce quantity of errors
- Arrange accounting of goods on expiration dates
- Integrate WMS "1C Logistics: Management of warehouse 3.0" with the system of processing Marel and "1C: Trade Management"
Project Features
- Food with an unstable weight are stored in a warehouse
- Work with goods of different temperature conditions
- Lot-based accounting
- Storage ranges on expiration dates for goods in one cell
Project Results
- Speed of acceptance increased twice, selection and shipment — by 4 times
- Capacity of a warehouse increased
- Storage on expiration dates is arranged
- Uninterrupted goods acceptance from production lines is provided
- Accounting on the weight and the number of places is developed
- Opportunity placement through transits is implemented
- Reservation of cells under the order on the amount and an order of shipment in run is performed
- The dependence on personnel is reduced
- Double entry of information is eliminated
- Integration with the system of processing Marel and "1C: Trade Management" is developed
- 2 stationary and 15 mobile jobs with connection of radio data collection terminals are automated