Project
Tchaikovsky gateway (Votkinsk water-engineering system) (Complex projects of service of the engineering systems)
Customers: Tchaikovsky gateway (Votkinsk water-engineering system) Contractors: Smartengineering Product: Complex projects of creation of the engineering systemsProject date: 2012/10 - 2013/09
|
On February 10, 2016 it became known of project completion of implementation of the systems of ensuring transport security on Tchaikovsky the navigable gateway. The project was implemented by Smartengineering group.
Project Tasks
It was required to install technical watch facilities, access control, communication and protection on objects and the territory of the Votkinsk water-engineering system.
Project Results
Project implementation allowed to equip the territory of the gateway with systems:
- collecting, processing and information display (SSOI);
- television observation (STN);
- control and access control (ACS);
- security alarm of perimeter and premises (SOS);
- disturbing signaling (STS);
- conference circuit and loud-speaking notification (SDS);
- local telephone communication (upgrade);
- security lighting (SOO);
- engineering facilities of protection.
All systems are functionally independent; the SSOI, STN, SOS, ACS systems are integrated into structure of a uniform hardware-software technical complex. Protection against unauthorized access and a possibility of remote control is provided (Ethernet, Internet).