History
2015
On a building site of the second queue of the electro-winning facility of copper of JSC Uralelectromed works on a base tab come to an end. Construction reached new level. For PSTsM branch in Verkh-Neyvinske new melting furnaces in workshop on production of lead are installed Within reconstruction of metallurgical production of JSC Svyatogor installation of Installation of neutralization of sulfuric acid and SKTs-1 and SKTs-2 Plate heat exchangers. Continuation of building of the second queue of the Electro-winning facility of copper for JSC Uralelectromed. The beginning of construction of lifting complexes of trunks No. 1 and No. 2 for EuroChem-Usolye Potash Plant LLC (Berezniki, Perm Krai)
2014
Beginning of building of the second queue of the electro-winning facility of copper of JSC Uralelectromed Start of the block of treatment facilities for a pipe-rolling camp of FQM on Seversky Pipe Plant The works on reconstruction of pipe-rolling production on Seversky Pipe Plant are completed End of the SMR complex on an object "Expansion of the Beloyarsk NPP power unit No. 4 with the BN-800 reactor" (Zarechny) Commisioning of a continuous camp of FQM on Seversky Pipe Plant (Polevskoy). The construction of buildings and constructions of the Superficial complex of mines New, Cager, by Skipovaya for Gaysky GOKA is completed (Mr. Guy, the Orenburg Region) The beginning of SMR on the project "Construction of CHPP Akademicheskaya in Yekaterinburg
2013
Reconstruction of chemical and metallurgical production of Karabashmed Ltd (RMK). Installation and commisioning of the new rotor furnace settler of KUMERA company (Finland). Construction of an oleumny absorber within reconstruction of objects of a System of evacuation of off gases of JSC Svyatogor
2012
Commissioning of the first stage of the electro-winning facility of copper of JSC Uralelectromed Installation of installation of dehydrogenation of propane within construction of a complex on production of polypropylene of Tobolsk-Polimer LLC (SIBUR Holding) Tobolsk Reconstruction of a chemical metallurgy sector. Copper-smelting production of JSC SUMZ
2011
Commissioning of objects of the second start-up complex of Anti-Pinsk Refinery Ltd (Tyumen) Beginning of reconstruction of pipe-rolling production of JSC Seversky Pipe Plant (Pipe Metallurgic Company)
2010
Receiving admission to works in SRO NP Builders of Sverdlovsk Region Commissioning of the second start-up complex of the Anti-Pinsk oil refinery (Tyumen) Input in a system of the Fifth production line of JSC Sukholozhsktsement (Sukhoy Log) Completion of construction of facilities of JSC Sredneuralsk State District Power Plant Delivery of a full range of technology equipment of Haybullinsky enrichment factory Bashmed LLC (Sibay)
2009
Beginning of construction of facilities of the electro-winning facility of copper of JSC Uralelectromed (Verkhnyaya Pyshma) Complex of installation and construction works on the platform of the Vankorsky field for Vankorneft Ltd (Rosneft Oil Company) Replacement of pipeline communications in the territory of warehouse fuel and lubricants of JSC Koltsovo Airport Beginning of construction of the second start-up complex of Anti-Pinsk Oil Refinery Ltd (Tyumen) Commissioning of objects of reconstruction of a chemical metallurgy sector of JSC Sredneuralskiy Copper Smelter (Revda)
2008
Installation of the reservoir park for storage of oil products of oil depot No. 450 of LUKOIL-Permnefteprodukt LLC Installation of objects of reconstruction of a chemical metallurgy sector of JSC SUMZ (Revda) Solemn commisioning of the chipboard complex within the second stage of reconstruction of a steel-smelting complex of JSC STZ (Polevskoy) Installation of equipment, metalwork and pipelines on objects of JSC Sukholozhsktsement
2007
Construction of a full range of chipboard within the second stage of reconstruction of JSC STZ (Polevskoy) Gas purification installation commissioning, reconstruction of water management, installation of process pipelines on JSC STZ Beginning of construction of the Fifth production line of JSC Sukholozhsktsement
2006
Commissioning of blast furnace No. 5 of JSC NTMK (Nizhny Tagil) Completion of reconstruction of enrichment factory on JSC Svyatogor Krasnouralsk Commissioning of the shopping complex on Pekhotintsev St. Yekaterinburg Complex of installation and construction works on the Tarnyersky field of the Northern copper-zinc mine Mr. Ivdel Installation of a full range of MNLZ of SMS Demag company (Germany) within reconstruction of steel-smelting production of JSC STZ Construction of ESPTs with section of preparation of raw materials on JSC STZ
2005
Commissioning of department of briquetting of the Production of Polymetals of JSC Uralelectromed of Mr. branch Kirovgrad Dismantling, production and installation of gas outlet trunks of chimneys on JSC Arkhangelsk PPM, Novodvinsk Commissioning of workshop of hot galvanizing on JSC Uralelectromed Verkhnyaya Pyshma Installation of a framework of shopping center "Hermes Plaza" with multi-storey parking Installation of equipment of Rzhevskaya compressor station of the Yamal-Europe gas pipeline by request of JSC Gazprom Installation of the most powerful shearing press in Russia AKROS (France) in koprovy department of martin workshop of A.K. Serov Metallurgical Plant Installation of a framework of the Palace of game sports of UMMC.
2004
Installation of a framework of shopping center "Stroy-Arsenal" Installation of a framework of shopping center "Kupets" Installation of a smoke trunk from the steklofaolit 180 meters high for JSC AMMOFOS, Cherepovets Installation of department of drying of water suspension of JSC Plant of Pottery Installation of reference metalwork and steklofaolitovy trunk of a chimney of the boiler house of the 4th power unit of the Beloyarsk NPP Installation of shearing press AKROS (France) on Seversky Pipe Plant
2003
Installation of metalwork and technology equipment of Velko company (Italy) on JSC Plant of Pottery (building of an atomizer) Installation of metalwork and technology equipment of auxiliary complex IV of the block of the Beloyarsk NPP Commissioning of gas-purifying constructions of anode furnaces on JSC Uralelectromed
2002
renaming of the enterprise into JSC Uralmetallurgmontazh 2; commissioning of the AKOS installation of Mannesmann Demag Sack company (Germany) on JSC Seversky Pipe Plant, Polevskoy Construction of two body of JSC Kalina Concern Installation of a production line Tensilend (Spain-Russia) on JSC Revda Brick-works;
2001
Commissioning of the AKOS installation ("furnace ladle") of Fuchs Systemtechnik company (Germany) on JSC Uralmash Dismantling of the failed exhaust trunks and replacement their steklofaolitovy at consolidation Intaugol (Arkhangelsk) is carried out to the shortest possible time (23 days);
2000
installation of metalwork of workshop and framework of the AKOS installation on Seversky Pipe Plant Boiler house and chimney of the Alstom of SEMZ plant
1999
equipment installation, metalwork of Voest-Alpine Industrieanlagenbau company (Austria) in workshop of roasting of NTMK limestone, Mr. Kushva;
1998
installation of a production line of workshop of copper rolled wire of Uralelectromed plant, Verkhnyaya Pyshma;
1997
complex of works of the PEPSI COLA plant, Yekaterinburg;
1995
construction of a rack warehouse at the New and Sverdlovsk combined heat and power plant; (link → page of an object)
1992
privatization of the enterprise, secession of Uralmetallurgmontazh trust, obtaining status of JSC The Second Sverdlovsk Mounting Management Uralmetallurgmontazh;
1990
installation of a pipe welding camp 20-76 with installation of longitudinal cutting on Seversky Pipe Plant;
1985
installation of technology equipment of a boiler and procurement complex of Himmash;
1983
start-up of the Metanol-750 plant, Gubakha;
1982
delivery and start in Ivdel pervoy in the territory of Sverdlovsk region gas compressor station;
1980
installation of equipment for production of a ftorvodorod and ammophos at Cherepovets chemical plant;
1978
the Soyuzshakhtospetsmontazh trust is renamed into Uralmetallurgmontazh;
1977
installation of the body of gray malleable iron at the KAMAZ plant Naberezhnye Chelny;
1973
start-up of workshop of cold rolling VISA;
1971
installation of the main pipeline of the Izhevsk automobile plant;
1968
start-up of asbofabriki No. 6 to Asbest;
1958
production and installation of the USSR's first gas outlet trunk from layered polymeric material on the basis of the faolit;
1957
the enterprise is a part of Soyuzshakhtospetsmontazh trust;
1954
there was a merge of the Verkhnyaya Pyshma office and Alyuminsantekhmontazh trust;
1948
based on Krasnouralsky office the Upper Pyshma office of Stroimontazh trust is created;
1942
the basis in Krasnouralsk mounting office as a part of All-Union trust "Stroimontazh" of the Ministry of nonferrous metallurgy of the USSR.