Uralmetallurgmontazh 2

Company

width=200px

Content

History

2015

On a building site of the second queue of the electro-winning facility of copper of JSC Uralelectromed works on a base tab come to an end. Construction reached new level. For PSTsM branch in Verkh-Neyvinske new melting furnaces in workshop on production of lead are installed Within reconstruction of metallurgical production of JSC Svyatogor installation of Installation of neutralization of sulfuric acid and SKTs-1 and SKTs-2 Plate heat exchangers. Continuation of building of the second queue of the Electro-winning facility of copper for JSC Uralelectromed. The beginning of construction of lifting complexes of trunks No. 1 and No. 2 for EuroChem-Usolye Potash Plant LLC (Berezniki, Perm Krai)

2014

Beginning of building of the second queue of the electro-winning facility of copper of JSC Uralelectromed Start of the block of treatment facilities for a pipe-rolling camp of FQM on Seversky Pipe Plant The works on reconstruction of pipe-rolling production on Seversky Pipe Plant are completed End of the SMR complex on an object "Expansion of the Beloyarsk NPP power unit No. 4 with the BN-800 reactor" (Zarechny) Commisioning of a continuous camp of FQM on Seversky Pipe Plant (Polevskoy). The construction of buildings and constructions of the Superficial complex of mines New, Cager, by Skipovaya for Gaysky GOKA is completed (Mr. Guy, the Orenburg Region) The beginning of SMR on the project "Construction of CHPP Akademicheskaya in Yekaterinburg

2013

Reconstruction of chemical and metallurgical production of Karabashmed Ltd (RMK). Installation and commisioning of the new rotor furnace settler of KUMERA company (Finland). Construction of an oleumny absorber within reconstruction of objects of a System of evacuation of off gases of JSC Svyatogor

2012

Commissioning of the first stage of the electro-winning facility of copper of JSC Uralelectromed Installation of installation of dehydrogenation of propane within construction of a complex on production of polypropylene of Tobolsk-Polimer LLC (SIBUR Holding) Tobolsk Reconstruction of a chemical metallurgy sector. Copper-smelting production of JSC SUMZ

2011

Commissioning of objects of the second start-up complex of Anti-Pinsk Refinery Ltd (Tyumen) Beginning of reconstruction of pipe-rolling production of JSC Seversky Pipe Plant (Pipe Metallurgic Company)

2010

Receiving admission to works in SRO NP Builders of Sverdlovsk Region Commissioning of the second start-up complex of the Anti-Pinsk oil refinery (Tyumen) Input in a system of the Fifth production line of JSC Sukholozhsktsement (Sukhoy Log) Completion of construction of facilities of JSC Sredneuralsk State District Power Plant Delivery of a full range of technology equipment of Haybullinsky enrichment factory Bashmed LLC (Sibay)

2009

Beginning of construction of facilities of the electro-winning facility of copper of JSC Uralelectromed (Verkhnyaya Pyshma) Complex of installation and construction works on the platform of the Vankorsky field for Vankorneft Ltd (Rosneft Oil Company) Replacement of pipeline communications in the territory of warehouse fuel and lubricants of JSC Koltsovo Airport Beginning of construction of the second start-up complex of Anti-Pinsk Oil Refinery Ltd (Tyumen) Commissioning of objects of reconstruction of a chemical metallurgy sector of JSC Sredneuralskiy Copper Smelter (Revda)

2008

Installation of the reservoir park for storage of oil products of oil depot No. 450 of LUKOIL-Permnefteprodukt LLC Installation of objects of reconstruction of a chemical metallurgy sector of JSC SUMZ (Revda) Solemn commisioning of the chipboard complex within the second stage of reconstruction of a steel-smelting complex of JSC STZ (Polevskoy) Installation of equipment, metalwork and pipelines on objects of JSC Sukholozhsktsement

2007

Construction of a full range of chipboard within the second stage of reconstruction of JSC STZ (Polevskoy) Gas purification installation commissioning, reconstruction of water management, installation of process pipelines on JSC STZ Beginning of construction of the Fifth production line of JSC Sukholozhsktsement

2006

Commissioning of blast furnace No. 5 of JSC NTMK (Nizhny Tagil) Completion of reconstruction of enrichment factory on JSC Svyatogor Krasnouralsk Commissioning of the shopping complex on Pekhotintsev St. Yekaterinburg Complex of installation and construction works on the Tarnyersky field of the Northern copper-zinc mine Mr. Ivdel Installation of a full range of MNLZ of SMS Demag company (Germany) within reconstruction of steel-smelting production of JSC STZ Construction of ESPTs with section of preparation of raw materials on JSC STZ

2005

Commissioning of department of briquetting of the Production of Polymetals of JSC Uralelectromed of Mr. branch Kirovgrad Dismantling, production and installation of gas outlet trunks of chimneys on JSC Arkhangelsk PPM, Novodvinsk Commissioning of workshop of hot galvanizing on JSC Uralelectromed Verkhnyaya Pyshma Installation of a framework of shopping center "Hermes Plaza" with multi-storey parking Installation of equipment of Rzhevskaya compressor station of the Yamal-Europe gas pipeline by request of JSC Gazprom Installation of the most powerful shearing press in Russia AKROS (France) in koprovy department of martin workshop of A.K. Serov Metallurgical Plant Installation of a framework of the Palace of game sports of UMMC.

2004

Installation of a framework of shopping center "Stroy-Arsenal" Installation of a framework of shopping center "Kupets" Installation of a smoke trunk from the steklofaolit 180 meters high for JSC AMMOFOS, Cherepovets Installation of department of drying of water suspension of JSC Plant of Pottery Installation of reference metalwork and steklofaolitovy trunk of a chimney of the boiler house of the 4th power unit of the Beloyarsk NPP Installation of shearing press AKROS (France) on Seversky Pipe Plant

2003

Installation of metalwork and technology equipment of Velko company (Italy) on JSC Plant of Pottery (building of an atomizer) Installation of metalwork and technology equipment of auxiliary complex IV of the block of the Beloyarsk NPP Commissioning of gas-purifying constructions of anode furnaces on JSC Uralelectromed

2002

renaming of the enterprise into JSC Uralmetallurgmontazh 2; commissioning of the AKOS installation of Mannesmann Demag Sack company (Germany) on JSC Seversky Pipe Plant, Polevskoy Construction of two body of JSC Kalina Concern Installation of a production line Tensilend (Spain-Russia) on JSC Revda Brick-works;

2001

Commissioning of the AKOS installation ("furnace ladle") of Fuchs Systemtechnik company (Germany) on JSC Uralmash Dismantling of the failed exhaust trunks and replacement their steklofaolitovy at consolidation Intaugol (Arkhangelsk) is carried out to the shortest possible time (23 days);

2000

installation of metalwork of workshop and framework of the AKOS installation on Seversky Pipe Plant Boiler house and chimney of the Alstom of SEMZ plant

1999

equipment installation, metalwork of Voest-Alpine Industrieanlagenbau company (Austria) in workshop of roasting of NTMK limestone, Mr. Kushva;

1998

installation of a production line of workshop of copper rolled wire of Uralelectromed plant, Verkhnyaya Pyshma;

1997

complex of works of the PEPSI COLA plant, Yekaterinburg;

1995

construction of a rack warehouse at the New and Sverdlovsk combined heat and power plant; (link → page of an object)

1992

privatization of the enterprise, secession of Uralmetallurgmontazh trust, obtaining status of JSC The Second Sverdlovsk Mounting Management Uralmetallurgmontazh;

1990

installation of a pipe welding camp 20-76 with installation of longitudinal cutting on Seversky Pipe Plant;

1985

installation of technology equipment of a boiler and procurement complex of Himmash;

1983

start-up of the Metanol-750 plant, Gubakha;

1982

delivery and start in Ivdel pervoy in the territory of Sverdlovsk region gas compressor station;

1980

installation of equipment for production of a ftorvodorod and ammophos at Cherepovets chemical plant;

1978

the Soyuzshakhtospetsmontazh trust is renamed into Uralmetallurgmontazh;

1977

installation of the body of gray malleable iron at the KAMAZ plant Naberezhnye Chelny;

1973

start-up of workshop of cold rolling VISA;

1971

installation of the main pipeline of the Izhevsk automobile plant;

1968

start-up of asbofabriki No. 6 to Asbest;

1958

production and installation of the USSR's first gas outlet trunk from layered polymeric material on the basis of the faolit;

1957

the enterprise is a part of Soyuzshakhtospetsmontazh trust;

1954

there was a merge of the Verkhnyaya Pyshma office and Alyuminsantekhmontazh trust;

1948

based on Krasnouralsky office the Upper Pyshma office of Stroimontazh trust is created;

1942

the basis in Krasnouralsk mounting office as a part of All-Union trust "Stroimontazh" of the Ministry of nonferrous metallurgy of the USSR.