"Absolute" implemented optimization appliances of planning of production processes

Customers: Absolute (printing house)

St. Petersburg; Polygraphic activity

Product: 1C: Polygraphy

Project date: 2016/03  - 2016/09

On September 15, 2016 the Armex company announced system implementation "to 1C: Polygraphy 8" in Absolyut printing house.

Project Tasks

In production of the individual and personalized packaging the company uses the big park of the highly specialized equipment. During processing of each order a large number of technology transactions is executed, and at production of limited or single packaging the complexity of execution of works increases.

Advertizing "Absolute", (2016)

For the purpose of increase in enterprise performance the management made the decision on software implementation for acceleration of processing and a holiday of orders in production for different technology chains, optimization of loading of the equipment and gain control of respect for technology. Besides, the printing house is ISO-certified 9001:2008 and for work on the standard it was necessary to normalize production processes and to formalize internal document flow of the enterprise.

For the operational and qualitative solution of these tasks the management of the enterprise decided to automate work of divisions using a system "1C: Polygraphy 8". The developer company of the solution — Armex became the partner in implementation.

Project Results

Order processing time was reduced, operational planning of production is organized, loading of the equipment is optimized. Taking into account requirements of the international quality standard of ISO 90001:2008 internal document flow of the enterprise, a normirovana prepress, printing and postprinting production processes and also calculation of cost of orders is formalized.

Strict control of respect for technology and priority of production operations is provided. Errors and defects at production are excluded. For 30% passing of orders at all stages of a production cycle accelerated. Sales volume grew by 10%.