RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Sibur Neftekhim (DPC Projects of creation and upgrade)

Customers: Sibur Neftekhim

Dzerzhinsk; Oil industry

Contractors: Sonet
Product: DPC Projects of creation and upgrade

Project date: 2011/01  - 2011/03

Creation of the Data processing center. Technical solutions: DPC, SCS, a distribution network, conditioning systems, the guaranteed power supply, the ACS.

The new data processing center and structured cabling system significantly improved architecture of a corporate IT system Sibur Neftekhim, expanded possibilities of the enterprise for use of business applications.

Within the project the following subsystems were designed and created:

  • Structured cabling system — 470 ports of category 6 Molex PN Ave.-va
  • Distribution network – Legrand
  • The system of the guaranteed power supply is APC
  • The conditioning system is Daikin
  • The control system of access is Perco
  • System of automatic gas fire fighting.
  • JSC Sibur Neftekhim (Dzerzhinsk)

As a result Sibur Neftekhim received a productive, scalable, reliable and safe data processing center.