Developers: | TeleCore (Telekor) |
Technology: | Data processing centers are technologies for DPC |
Content |
It is intended for unification of "carrying out" of the centralized information systems in remote divisions, branches, at the isolated enterprises.
- Power on one Pass DPC up to 20 kW of IT and telecommunication equipment;
- It is brought into operation in 1 day;
- Completely centralized operation;
- Execution with electromagnetic protection;
- Placement in any premises;
- Separation into two zones with autonomous access;
- Local service by the construction electrician.
Appointment of ready DPCs
- Operational ensuring requirements of departments and state institutions in computing powers and tanks for storage of large volumes of data
- Creation of the unified unified infocommunication environment of geographically distributed departments and public institutions
- Creation of modern distributed systems for collecting and enrichment of data in places of their emergence and ensuring "fast" access to local users
- Increase in energy efficiency of the used infrastructure solutions
- Reduction of cost of infrastructure
The protected modules of DPC
Using specialized modules the following problems are solved:
- The protected processing and data storage, up to processing of the state secret
- The organization of the selected zones with a specific mode of access
- Placement of the legacy equipment with increased requirements to temperature condition and a relative humidity
- Organization of additional reservation of especially important segments of information systems
Energy saving modules for progressive technologies
Are intended for:
- Mass servers and problems of the class "BigData";
- Constructions of the modern systems on the basis of distributed databases;
- Applications of the industrial Internet;
- Special calculators on ARM or VISC technology.
Comparison with other technologies of creation of DPC
Advantages of use of ready DPCs Telekor
- Reduction of terms of creation of DPC
- Protection of investments – expansion of DPC happens in process of requirement growth by adding of the modules intended for technologies of "tomorrow"
- Reduction of capital costs
- Reduction of risks of failure to meet time constraints of creation
- Reduction of unproductive operating costs for cooling – in progressive energy saving modules to be spent for cooling no more than 10% of the power of IT of the equipment
- Natural ensuring any required level of protection of the selected zones
- Completely Russian development and production. Simple replacement of some producers of separate nodes by others, at a complete set use only of the Russian equipment is possible.