Danio
Russia
Volga Federal District of the Russian Federation
Cheboksary
Kalinin St., 66, House of the Unions, office 105
Content |
History
2016
Deliveries and installation of the server hardware in the organizations of the state and commercial sectors in the volume exceeding several times indicators of last years are carried out. The projects implemented in public sector became the most interesting. The system of archiving and data storage for Arbitration court of the Chuvash Republic was installed. Servers for special video surveillance in OFPS of the Russian Federation are developed and delivered. "The information and library center" for the Ministry of Education of the Chuvash Republic which part are is created: 3D - a cinema hall, laboratory of virtual reality, 3D - laboratory, a robotic polygon.
2015
In April, 2015 TTS company solemnly opened the dealer center Hyundai in the residential district "New City". Danio undertook obligations under the general contract of start of all low-current engineering systems of this object. Long-term cooperation of our company with the Customer became decisive when obtaining the contract. In the project it was implemented: SCS, IP video surveillance, security fire warning, management system and access control, automatic fire fighting, cable television. The customer, having appointed the uniform contractor, strongly won as the price of the project was reduced by 23% in connection with consolidation of low-current routes and application of the uniform standard of cable products. The term of construction works was reduced and the task of commissioning of the object to technical services was facilitated. All executive documentation, marking of cable systems was executed in uniform style that is important during the subsequent operation of the building.
2014
We continue to cooperate with PJSC Sberbank on construction of new departments. The most significant object - the Center of business development of Sberbank of Russia. In it the conference room of Habpeys for 93 seats where it is possible to hold free events for clients was placed.
According to requirements of the customer, each workplace in new departments was equipped with four or five ports of telecommunication sockets of category 5e and ten electric plug adapters. The different specialized equipment is connected: ATMs, US, booths, WiFi access points, multimedia complexes. Works are done ahead of schedule. 404 ports are mounted and connected, more than 67000 meters of a cable are laid.
In Day of the Republic the ceremony of opening of new machine-assembling workshop LLC NPP EKRA on Traktorostroiteley Avenue was held on June 24, 2014. The enterprise expands production areas and starts the first stage of a multifunction complex (IFC) of production administrative assignment. Start of the second and thirds of queues is planned in 2015th and 2016th respectively. The total amount of the enclosed investments first of all of a complex was 340 million rubles, and 1.5 billion rubles in general are invested in a complex that will allow to create 1000 new jobs. Our company began works on this object on blueprint stage. In implementation process of the project we recommended modern solutions of electric lighting and management of communications of industrial buildings, control of construction works and installation of the following equipment is carried out:
AGPT of the Spanish producer LPG (TYCO); climatic equipment of Daikin for cooling of server; the module for scheduling and monitoring of the equipment of own development using Moxa controllers. For laying of SCS the American producer Siemon was selected, in a basis the cable 4-pair kat, 5E, by U/UTP LSOH, Solid, 24AWG, 160MHZ, the having large supply on physical characteristics is used.
2013
The company management of JSC NPP EKRA suggested us to undertake project implementation of construction of the Data Processing Center (DPC) of the plant. At accomplishment of this project engineers Danio considered the Customer's wishes, having integrated the premises of the server room with the new premises of DPC, not mentioning the worker of SCS. We managed to complement successfully SCS with new elements and to provide a free space in telecommunication cabinets with perspective of future organization development of the Customer. The project provided also creation of infrastructure of DPC which included: scheme of the organization of the equipment, SCS, installation of power supply and lighting, equipment of conditioning and ventilation, AGPT, monitoring module. The interesting solution was applied at installation of electric lighting. Because of possible false operations of AGPT the LED lighting with the supply voltage of 48 Volts implemented using PoE technology was set.
We won the public contract on construction of SCS in the building of the Pension Fund of the Russian Federation on AMPTRAC technology which consists of two parts: AMP NETCONNECT in the field of the passive equipment and Infrastructure Configuration Manager (ICM) in the field of the software. Technology, in terms of use, ambiguous, but the project was interesting, first of all, as an engineering task.
In June signed the partnership agreement with Telephone systems company on distribution and implementation of the switching center Oktell.
In the 3rd quarter carried out automation at new brick-works Ketra. After adjustment and start of the pipeline there was a question of industrial automation, management and sales department. Cable infrastructure of SCS on an object was constructed, will unroll industrial WiFi. Further together with Foton Group within the project of control automation and sales our specialists installed the ERP system of "Eludia", the server of a switching platform of Oktell and made integration of these systems.
2012
The Danio company won competition on design and installation of low-current networks in car showrooms of Transtekhservice company. The car showroom Toyota became the first handed-over object. Works on an object broke into three stages: design, installation, equipment commissioning. At the beginning of the project looked narrowly at us, but over time entrusted also delivery of the passive equipment. It was much cheaper as at Danio direct agreements are signed with distributors of the equipment supplied to Russia. On the following objects the Customer - TTS and the General contractor Millenium company suggested to expand the nomenclature of works, having included an access control system, a security alarm, the fire warning, television, video surveillance, SCS. Works on motor shows are performed: General Motors, Renault, Toyota.
2011
The tender prize on the right of participation in reconstruction of departments of the Volga-Vyatka division of Sberbank of the Russian Federation became a milestone event in the company. In the 2011th year we converted 12 Sberbank branches in the Chuvash Republic, having mounted SCS with a 15-year guarantee, within the global project on reformatting of structure of bank on modern bank standards. The main differences of office of bank of new type — high technical equipment and modern external execution. At offices it is spacious also light, soft sofas, color schemes, intuitive navigation pleasant to an eye. Modern terminals of an electronic queue and open operational racks help each visitor to receive services within 2 minutes. During operation over the project experiment on connection of the new information and bank equipment was added to a moneybox of the company. The number of projects on implementation of SCS in 2011 grew by 2.5 times. Deliveries of a computer hardware grew twice. In total we equipped 14 "turnkey" server premises, including complex supplies of equipment and the software.
2010
Began to cooperate with Dolce vita company Nizhny Novgorod on construction of the engineering systems. Use of advanced technologies by our company in power supply became decisive when choosing the contractor on these work types. Carried out works in the logistic centers for deployment of SCS, video surveillance, power supply, lighting in Cheboksary, Kazan, Yoshkar-Ola.
In the new building of Service of court ushers of. The mythical stone was constructed by category 6A SCS. This standard just appeared in 2008 and it was interesting to us to put it into practice. The cable consisted of 4 couples of conductors, but the increased section in the diameter with in addition separated plastic core. This cable was whimsical to quality of laying, but we coped with a task. To the customer issued the warranty certificate for 25 years. This technology allowed to put in SCS data transmission potential at a speed up to 10 Gbps.
2009
From this year TUS Ltd University within the agreement between the Government of the Republic of Chuvashia and Federal Fund of assistance to development of housing construction performs building of the residential district ("RZhS Fund). At accomplishment of the federal housing development programme there was a task to monitor growth of objects on platforms in the mode "online". Dmitry Anatolyevich Medvedev watched the project course personally. What surprise of the Moscow curators when on the following morning after transfer of important order they received the picture was. It was implemented by method of connection to the existing cameras normal IP видеосервера and the router.
2008
Executed the "turnkey" project - from a stage of technical specifications before start of SCS - in the new building of the Supreme Court of the Chuvash Republic. This first building of the Supreme Court in Russia constructed directly for needs of judges. We performed works on the contract at Chuvashgrazhdanproyekt design institute. The designed and built low-current network consisted of 526 SCS ports on the new Siemon cable of category 5e with a frequency of 350 MHz, the equipment of sound amplification and video conferences in halls of the Supreme Court. Hollow channels became the interesting solution for cable laying in walls that allowed to increase further without excess costs quantity of jobs in premises with expensive finishing.
2007
Executed the project on the SCS installation on subcontracting at Transneft company – constructed SCS in Kanashsky school No. 22. Set 610 ports of category 5e, carried out balancing and commissioning in the server premises, within complex delivery installed and configured servers and storages from Hewlett-Packard.
Began to cooperate with Elena holding - constructed SCS in Kontur management company, performed complex delivery of server and network equipment from DELL producer. The company was faced by a task to construct SCS at open-office of the size of three volleyball courts without uniform partition. The originality of this solution is still used by us at construction of the opened offices or in places of big accumulation of SCS ports.
2006
We continue to cooperate with Management of judicial department on automation of 20 city and district courts. Performed complex delivery of computers and office equipment, executed installation of a structured cabling system with a 15-year guarantee, installed sound reinforcement systems and branch exchanges.
1996: Creation of the company
This year the SCS installation in the Central district hospital of the village of Morgaushi became the most remarkable event. We got the first experience of creation of the star-shaped structure distributed by SCS using the local segments of category 5 connected by branches on the ancient coaxial cable. At that time was considered that at connections between the body such technology more reliable and works at lengths up to 300 meters. In general the network turned out rather steady, though not deprived of some features of operation in connection with collisions (on nodes simple hubs were used). Routine production a patch cords manually was most of all remembered, those years supplies of equipment were not well arranged yet, and the range did not include such necessary thing.