Project

Conversion of planning process of demand in "Moscow Hilt Brewery" for SAP IBP for Demand

Customers: Moscow Hilt brewery (EFES Group in Russia)

Moscow; Food industry

Contractors: SAP CIS
Product: SAP Integrated Business Planning (SAP IBP)

Project date: 2015/04  - 2016/09

To: problems and opportunities

  • Planning process of demand was executed in spreadsheets
  • The integrated data collection from the initial systems was not supported
  • The most detailed forecasts were under construction at the Brand level - Region. It was very difficult to disaggregate data in spreadsheets
  • Support of data integration of Volume Building Blocks into the final forecast was required.

This process was executed manually in the spreadsheet

Why SAP?

  • The single integrated platform for support of planning process of demand
  • Expert service which helped to perform effective implementation in only eight months
  • Local data processing center in Russia for placement of cloud solutions

After: The results focused on profit

  • The solution allowed to create the integrated process of data collection of the initial systems and semi-automatic data scrubbing
  • SAP IBP for Demand allows to process huge amounts of data. Big detailing of data is supported, than it was planned initially — at the level of the warehouse / channel / commodity unit
  • Comparison of a final demand forecast with expectations of AC Nielsen and average sales amount for the active customer base was carried out
  • All special requirements the Hilt were implemented in the solution
  • Forecasting accuracy at the previous low level (client / region) improved on 6 items after 1 go month of work. (*danny on TT channel). Improvement of forecast accuracy only on TT channel after the 1st month of work
    • More than by 20 times detailing of data at final demand planning increased
    • ~ 20% decrease in labor costs at demand planning
    • Improvement of processes of data collection, data scrubbing and preparation of the forecast
    • 8 months from planning before commissioning
    • Expansion of abilities to manage processes in a supply chain

Project History

In the Company business planning process of demand which included the following steps was formalized and approved in practice:

  • Preparation of a basic demand forecast using methods of time series analysis
  • Assessment and formation of uplifts of sales and marketing, among which:
    • Taking note on the forecast of an output to the market of new products, including – accounting of effect of cannibalization
    • Accounting of promotion actions in traditional and modern retail
    • Accounting of plans of inclusion of products in listing and exceptions of it
    • Other Volume Building Blocks - about 12

  • Planning was performed at the Sales channel level - "A geographical division" - Brand
  • The task of disaggregation of data of demand planning to the SKU level – "Business partner" was set
  • Planning was performed in the MS Excel, support of formats of data was performed manually by forces of division of IT support
  • Data preparation of base of disaggregation it was also performed manually by forces of division of IT support
  • The task of disaggregation of data of demand planning on the week level and implementation of short-term planning was set

Process of mid-term forecasting

Preparation of the forecast

  • Collecting of historical data
  • Cleaning of history
  • Creation of the baseline plan
  • Preparation of base of cannibalization – the list of similar goods for new products and absorption coefficients

Meeting with marketing departments and sales

  • Collection of data on marketing and sales
  • Updating of events
  • Determination and impact assessment

Consistency check

  • Consolidation of forecasts
  • Consistency check
  • Assessment of discrepancies with business data
  • Offer of the forecast

PreDRM; DRM

  • Accomplishment of DRM: approval of the plan
  • Providing feedback coupling to marketing departments, sales and finance
  • Updating of events and assessment of the forecast
  • Accomplishment of the detailed approved plan

Meeting S&OP

  • Holding meeting S&OP
  • Providing feedback coupling to marketing departments, sales, finance and SC
  • Updating of events and assessment of the forecast
  • Accomplishment of the detailed approved plan

Obvious difficulties

  • Possibilities of the MS Excel as means of complex automation of business planning process of demand are insufficient
  • Low automation of basic processes required the large volume of manual work on data purification of adjacent divisions and elimination of errors of a human factor
  • Restrictions of the MS Excel as computing platform complicated:
    • disaggregation Implementation
    • Archiving and reuse of these last sessions of forecasting
    • Scenarios and versions
    • Management of powers on data access
    • Automatically prepared reporting in different cuts

  • Inevitability of automation business - process on the industrial platform became obvious

Project milestones

Process of mid-term forecasting

System architecture

Integration flows:

  • The entering flow of basic data: SAP BW-> IBP
  • The entering flow of transaction data: SAP BW sales history-> SAP IBP
  • The entering plan data stream promo in Modern Trade: Excel (with VBA)-> SAP IBP
  • Outgoing flow of transaction data: results of forecasting of SAP IBP-> SAP BW

Testing

Prototyping was performed on limited scope of data:

  • 2 most mass brands
  • All regions / businesses clients / networks – the complete customer base

Integration testing was carried out in 4 steps:

  • Working off of mathematics on limited scope in a test environment
  • Working off of integration at complete volume in production environment
  • Working off of disaggregation on complete volume in production environment
  • Stress test in production environment

Project Results