2023: Construction of a multidisciplinary clinic

On November 1, 2023, it became known about the construction of a multidisciplinary clinic on the basis of the Balashikha Regional Hospital in the Moscow Region. The volume of investments in this project amounts to 36.27 billion rubles.

As the publication "Vesti Moscow Region" writes with reference to the materials of the relevant tender announced by the Committee on Competitive Policy of the Moscow Region, in 2023 the contractor will be allocated 223.15 million rubles, in 2024 - 3.97 billion rubles, in 2025 - 4.96 billion rubles. In subsequent years, the winner of the competition will receive 27.12 billion rubles.

File:News 107283 1400.jpg
A multidisciplinary clinic is being built on the basis of the Balashikha Regional Hospital

As indicated in the project documentation on the EIS website in the field of procurement, the multidisciplinary medical center will include a complex of medical clinics, a training and research center. It will appear within the boundaries of the site with cadastral number 50:50:0000000:32784 (Zheleznodorozhny microdistrict) with an area of ​ ​ more than 11 hectares. According to preliminary data, 3,119 specialists will be able to work there, including 706 doctors.

The building will consist of two buildings - the main and the pathological, which will be connected by an underground passage. The project also involves the construction of an underground parking lot for 680 parking spaces, five checkpoints, technical buildings and structures.

The main building will consist of ten floors, on which there will be treatment departments of different profiles designed for 10-60 beds, an ambulance box, blood harvesting and transfusion stations, as well as several bacteriological laboratories.

In June 2023, the Governor of the Moscow Region Andrei Vorobyov announced plans to build a hospital in Balashikha for 50 billion rubles. The planned capacity of the medical institution was not announced then, but Vorobyov said that he had "found understanding" of President Vladimir Putin on this issue.[1]

2018: Central City Hospital Project Preparation

The project of the central city hospital in the Olgino microdistrict in Balashikha will be ready by mid-2019. This was announced to the Governor of the Moscow Region Andrei Vorobyov by the chief architect of the Moscow Region Mikhail Khaikin on July 12, 2018. Then competitive procedures will be carried out and construction work will start.

File:Aquote1.png
We looked at the Russian experience in the construction of medical facilities, world experience. Our task is to make a modern complex so that it is comfortable for residents, "Khaikin emphasized.
File:Aquote2.png

The hospital building with 1 thousand beds is planned to be built on the site of a demolished unfinished hospital. the project is supposed to be implemented in several stages. First of all, a reception department, a surgical building, laboratories, a transfusion and blood harvesting station and technical premises will be built. Further, it is planned to build therapeutic, pediatric and infectious buildings, CDC, as well as administrative buildings.

File:Aquote1.png
We are partnering with architects to design medical facilities around the world. We are very glad that there is an opportunity to share our knowledge so that they benefit and help create high-tech medical institutions that the region needs, "said Anton Zadorozhny, director of consulting at Philips Healthcare.
File:Aquote2.png

As of July 2018, the Central Regional Hospital is located in buildings located in different parts of the city. Many of them are in a dilapidated state, some of the departments are located in buildings that were not originally designed for medical institutions.[2]

File:Aquote1.png
For us, this is a key decision in terms of health care. There is a real shortage, including bed capacity. For 15 years, the population has doubled in the urban district, while practically no medical facilities have been built, "added the head of Balashikha, Sergei Yurov.
File:Aquote2.png

2017

In September 2017, the demolition of the unfinished KGB hospital in the Olgino microdistrict began, the contract for work with the contractor was concluded free of charge, the costs were compensated for by the building material remaining after dismantling.

1981-1991

The construction of the KGB hospital in the Olgino microdistrict was carried out from 1981 to 1991, after which the construction was frozen.