RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Akado-Telecom provided uninterrupted operation and stability of work of Soyuzmultfilm

Customers: Soyuzmultfilm

Product: Complex projects of creation of the engineering systems

Project date: 2018/09  - 2019/02

On March 21, 2019 AKADO Telecom announced signing of the contract with a film studio Soyuzmultfilm on development of the project and estimate and work documentation on an overhaul of the internal and external engineering and low-current systems necessary for functioning of objects in the territory of a film studio. In addition AKADO Telecom performed delivery of the diesel generator set with a power of 800 kVA for ensuring uninterrupted operation of process and stable work of a film studio.

File:Aquote1.png
Our company actively participates in project implementation of system integration of different degree of complexity. AKADO implements all complex of integration solutions for creation of uniform infrastructure of the customer, beginning from a research of an object, obtaining allowing documentation, project development and finishing with delivery and installation of equipment.
Vladimir Bereslavets, director of work with corporate clients of AKADO Telecom
File:Aquote2.png