RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

BVS-bidding (ABM Rinkai TMS)

Customers: BVS-bidding

Kiev; Trade

Contractors: ABM Cloud
Product: ABM Rinkai TMS

Project date: 2019/01  - 2019/06

Content

2019

Reasons of search of vendor

  • lack of the tool which would perform automatic calculation of delivery routes;
  • complexity in control of visit of points, lack of analytics which compares the plan with the fact;
  • high risks of miscalculations and errors, a lot of work became manually;
  • complexity in effective use of resources during the periods of rapid growth of demand.

Solution

The leadership team of the company made the decision on implementation of the program for automation of transport logistics of ABM Rinkai TMS. The following objects were set for a project team:

  • automate planning process of routes;
  • minimize, in settlement process of delivery routes, a human factor;
  • configure effective control behind accomplishment of routes;
  • establish the reasons of uneconomical actions and correct work of vehicle fleet;
  • reduce transportation costs.

Results and effects of the project

Using the ABM Rinkai program which performs automatic calculation of routes planning process began to take much less time, there was a transparency and an opportunity to analyze logistic processes of the company.

Also the company managed:

  • Lower transportation costs by 19%
  • Increase quantity of the points visited in time by 11%, thereby having increased the level of service
  • Lower a rerun by 12%
  • a system indicates the short or not crossed time windows that it allows, at an opportunity, quickly to manage them.

Having adjusted automatic calculation of routes, the company received the following results:

  • optimal conditions of loading of vehicle fleet on the basis of weight and dimensional product characteristics are defined – cars on average in weight became more loaded for 9%
  • visit 17% more points for 1 route became possible
  • expenses on delivery of 1 kg of products decreased by 10%
  • productive cooperation for more than 1.5 years and stable work of department of delivery.