RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

ER-Telecom started new DPC

Customers: ER-Telecom Holding (Дом.ru)

Product: DPC Projects of creation and upgrade

Project date: 2019/12  - 2020/06

2020: Start of DPC

On July 9, 2020 ER-Telecom Holding JSC " (TM Дом.ru) reported TAdviser that together with Ural center of security systems completed the project on to construction the center of processing data (DPC) which will become the main node in processing and information storages the operator.

ER-Telecom started new DPC

One of important features of the project is the compatibility of the solutions applied in DPC with specific telecommunication equipment for which operability it is necessary to provide its power supply with constant voltage of 48B. For this purpose in design process of engineering infrastructure of DPC the specific equipment was provided in composition of power supply: the invertor system, a vypryamitelny system, accumulators of sverkhbolshy capacity 1000ach with tension 2B and distribution panels 48B in server cabinets.

File:Aquote1.png
In the project progress on construction of DPC for JSC ER-Telecom Holding in Yekaterinburg it was necessary to consider a number of specific requirements to an object and restrictions of the provided platform. Such task often demanded from an engineering command not only high qualification, but also ability to apply non-standard approaches during the choosing and study of technical solutions, – Oleg Sidorov, the head of engineering infrastructure of DPC of UTsSB notes.
File:Aquote2.png

File:Aquote1.png
When choosing the partner for implementation of this project we were guided, first of all, by experience of the companies in construction of data processing centers. UTsSB company executed the project with observance of the stated terms and having provided high quality of execution of works, – the representative of JSC ER-Telecom Holding comments.
File:Aquote2.png