RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Cryogenic equipment (1C: ERP Enterprise Management 2.0)

Customers: Cryogenic equipment

Contractors: Aspect Omsk
Product: 1C: ERP Enterprise Management 2.0
На базе: 1C:Enterprise 8.3

Project date: 2019/05  - 2019/10
Number of licenses: 10

2019: Automation of accounting of design-technology preparation of production based on software "1C:ERP Enterprise management"

Until the beginning of works on the project as the client a set of programs of own development for accounting of design-technology preparation of production on a basis was used DBMS FoxPro. Due to the end of support DBMS and deficit of specialists made the decision on transfer of all functionality of the software product to a system "1C:ERP Enterprise management".

The performed works:

  • Personnel training to work with a program/a system
  • Works on setup and implementation of the standard/industry software
    • Creation of interfaces and sets of user rights
    • Initial settings of standard/industry solution (program) to start accounting
    • Data transfer from the previous automation systems
    • Integration into third-party automation systems
    • Collecting and requirement analysis of the customer to an automated system
    • Technical implementation of specific features of accounting and management in the automation system (adaptation)
    • Integration with other systems based on 1C: Enterprise
    • Planning of stages of works, drawing up job schedule
    • Methodical ensuring specific features of accounting and management in the automation system (the requirement to adaptation)

  • Installation and setup of the DBMS server

Within the first stage of works since October 28, 2019 subsystems for accounting in departments were put into operation:

  • Department of standardization. Integration and master data management. Subsystem of accounting of the restrictive list of materials of the enterprise;
  • Department of the chief technologist. Integration and master data management. Subsystem of accounting of design structure of products. From 1/16/2020 subsystem of accounting of routes of production of products.

The subsequent stages assume:

  • STAGE 2. Till 12/31/2020 to pass to operation of blocks of technology regulation and management of production processes;
  • STAGE 3. From 1/1/2021 to transfer regulated accounting of the organization in"1C:ERP Enterprise management".