RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Hospitaltechnik equipped Perm Cardiovascular Center with clean rooms in intensive care

Customers: S. Sukhanov Perm Federal Center for Cardiovascular Surgery

Product: Complex Systems Engineering Projects

Project date: 2020/09  - 2021/02

2021: Modernization of intensive care ward and intensive care wards in the children's ward

On March 4, 2021, Hospitaltekhnik announced that as part of the state contract, it had modernized the intensive care and intensive care wards in the children's anesthesiology and resuscitation department of the Perm Federal Center for Cardiovascular Surgery named after S. G. Sukhanov. They will provide emergency medical care to young patients in serious condition.

The Hospitaltechnik team delivered and installed the "HTLabor + Hospitaltechnik AG," a high-precision European equipment, in the Center for Medical Climatized Module.

The module includes large-format wall and ceiling panels, exhaust cabinets, embedded monitors, cabinets for storing consumables with hidden installation "flush."

The "modular" technology used allows cleaning and disinfection of premises without the formation of "stagnation zones," thereby reducing the risks of the spread of hospital infections. The Center also used special solutions: for example, one of the intensive care rooms is equipped with a sealed automatic door with a window made of smart glass, which changes transparency. Now nurses will be able to monitor the condition of patients without going into the room once again.

The complex of "clean" rooms for intensive care rooms is equipped with wall and ceiling consoles for the supply of medical gases, which allow placing the necessary medical equipment on them.

As part of the project, Hospitaltechnik delivered and configured an integrated system of centralized video signal management, which allows you to record, archive and transfer video from any video sources connected to the system to the outside. This makes it easier for doctors to observe and monitor the condition of small patients.

The integrated signal control system installed in Perm includes the main control monitor 27 ', the engineering system control monitor 24', 2 socket units with hardware adaptation of several video signals, 4 rotary video cameras and 1 ceiling speaker.

The network management system allows you to change the humidity and temperature in all three rooms, turn on and off the lighting, open and close the automatic door, and control the transparency of smart glass from one monitor.

The engineering system allows you to inform on time about the emergency conditions of the equipment in the intensive care unit: about the danger of fire, about problems with the supply of medical gases, about errors in the operation of the ventilation system, about problems with the uninterrupted power supply and accidents during the operation of the medical transformer. There is also an event log containing a list of alarm states of all resuscitation equipment.

Updated pediatric resuscitation will help doctors of the Perm Cardiovascular Center work in more comfortable conditions and provide medical care at a qualitatively different level.