RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

IDS Group (Axelot Logistics Consulting)

Customers: IDS Group (Ai Di Es)

Oil industry

Contractors: Axelot
Product: Axelot Logistics Consulting

Project date: 2015/08  - 2015/10

2015

Warehouses of the production support base in Nefteyugansk are characterized by a variety of warehouses of various configurations and a wide range of nomenclature groups. The warehouses store spare parts and components, tools and chemical reagents, personal protective equipment and workwear, specialized equipment. Most item groups require different storage and handling conditions.

Project prerequisites:

  • Significant increase in warehouse load due to the company's intensive growth rate

Project Tasks:

  • Optimize the operation of production support base warehouses
  • Improve utilization of available space

What is done:

  • Collection and analysis of information on peculiarities of goods, intensity and volume of goods flow, size and characteristics of warehouses
  • Analysis of information
  • Solutions for planning, equipping and modernization of all warehouses are presented

Project Outcome: Analytical report containing recommendations in the following areas:

  • Room layout
  • Calculation of parameters of lifting and transportation equipment and rack structures
  • List of equipment required for WMS implementation
  • Recommendations for modernization of storage infrastructure for compliance with government regulations
  • Methodological documents on organization of warehouse business processes