Project

Bobrovsky Meat Processing Plant (Svizitom: Building Operation and Maintenance)

Customers: Meat processing plant Bobrovsky

Food industry

Product: Sweesite: Building management and maintenance

Project date: 2021/08  - 2021/08

2021

The Building Operation and Maintenance module has been integrated into the plant in order to reduce equipment downtime due to unplanned repairs; build communication between employees; set up accounting, processing, storage of requests for repair and purchase of materials.

In this module it is possible to perform dispatching; ASU plan repairs and work; schedule regular and extraordinary inspections; Keep a record of the time when tasks are performed by calls. Notifications are received by. e-mail

To integrate the module, the following works were performed:

  • Visualization of workplaces was carried out - drawing the enterprise by sites (3D model).
  • Equipment inventory has been performed. Responsible persons have been appointed for the safety, repair and correct operation of this equipment. The equipment was placed on the model of the enterprise.
  • The existing system of requests for repair, PPM and maintenance is considered. Necessary adjustments have been made.
  • Customer's specialists have been trained to use the PPM module TOiR SVISITOM/.

For 12 months, the customer is provided with consulting support.