Customers: Petronas Contractors: Novomet-Perm Product: Comprehensive Engineering Systems ProjectsProject date: 2022/02 - 2022/07
|
2022: Installation of three Colibri ESP units
Petronas Three Colibri ESP units manufactured by the portfolio company "" were installed on the offshore platform of the company located near the city of Miri at the Tukau field.Novomet
The units were installed on a load-carrying cable in gas-lift wells. The operation was carried out using advanced technologies in the field of downhole and surface equipment: shut-off and flange valves are equipped with automatic remote control shutoff valves.
The peculiarity lies in the fact that the procedure was preceded by the dismantling of previous equipment, accompanied by well killing. This is the first time in offshore fields and is a precedent. The installed equipment has been started and put into operation, the customer is fully satisfied with its quality and reliability and is ready for further implementation at its fields.
Colibri ESP is a technology of well completion and operation by installation on a load-carrying cable, in which installation and lowering is carried out using a mobile compact complex without the use of current and overhaul teams. The popularity of the technology is growing around the world, as it can significantly reduce costs, reduce installation time and reduce production losses when replacing the installations of the electric centrifugal pump.