Customers: Bor Pipe Plant Construction and industry of construction materials Contractors: Sonet Product: SCS projects and wireless network infrastructureProject date: 2009/01 - 2009/04
|
The Sonet of NN company finished implementation of the complex project on creation of an information system on Bor Pipe Plant. The implemented project allowed the customer to implement at the enterprise a production management system based on "1C: Manufacturing Enterprise Management".
Characteristics of the project:
- Creation of a data transmission system, more than 5 km. fiber optic communication lines, reserve optical connections with the main buildings of the plant are created;
- Creation of SCS on 260 ports, category 5e Molex PN;
- The computer network based on the equipment of 3Com which part the failsafe core of a system based on trunk optical multiplexers was;
- The system of the centralized guaranteed power supply based on the equipment of APC;
- The antivirus protection based on solutions of Eset covering servers and jobs;
- A server system and storage system based on the equipment Hewlett Packard;
- Security system based on the domain Windows, transfer of staff of the plant (150 people) to the domain;
- The regulated Internet access.
The project deadline made 2 months. During the project production processes at the enterprise were never suspended.