Customers: Kurskagroterminal Contractors: 1520 Group of Companies Product: Elteza MPC-ELProject date: 2022/05 - 2022/11
|
2022: Implementation of microprocessor centralization system
Specialists GC 1520 have introduced a system of micro-centralization processor at the agro-industrial facility. The digital system for the development and production of the LAT Division will manage the railway cargo transportation production logistic complex "." Kurskagroterminal The Group of Companies 1520 announced this on December 6, 2022.
Microprocessors and SCB equipped switches of the Kastornaya-Novaya station. Through it there is a cargo turnover for the main enterprise of the complex - an oil extraction plant for processing soybeans, sunflowers and rapeseed with a capacity of 1 million tons per year. The centralization system also included 12 km of new tracks built by Kurskagroterminal LLC for effective transport logistics.
With the help of MPC-EL, the station personnel will remotely control arrows and traffic lights, automatically build train routes according to the specified parameters, diagnose pre-failure states, and monitor track occupancy using the axle counting system. Heating of switches is provided to protect against snow and ice.
In the future, it is planned to introduce a system for monitoring the movement of rolling stock (development and production of the LAT Division) at this site. It will display cars and locomotives in real time, taking into account technological connections, which will allow monitoring the condition of the car fleet and the duration of downtime.
As a result, the throughput of the lines will increase, operating costs will decrease, and cargo intervals will be reduced.